Using Simulation Method to Solve a Two-Echelon Repairable Inventory System Problem Subject to Service Constraints

碩士 === 國立成功大學 === 工業與資訊管理學系碩博士班 === 100 === In the field of production management,the study of multi-echelon inventory system has been a hot topic. We study a two-echelon repairable inventory system, which contains a central warehouse and multiple field depots that stock spare parts. When a failure...

Full description

Bibliographic Details
Main Authors: Fei-FangKuo, 郭斐芳
Other Authors: Shing-Chih Tsai
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/52213229047985218518