Application of rainfall erosion index to investigate the suitable construction months for slopeland development and calculate the temporary sedimentation amoutnt
碩士 === 國立中興大學 === 水土保持學系所 === 100 === Due to the topographical constraints, excavation and soil preparation are necessary during developing a large area of the building, which will cause erosion disaster. As the result, it is necessary to construct a temporary sedimentation pond. According the handb...
Main Authors: | Yen-Cheng Chen, 陳彥丞 |
---|---|
Other Authors: | 林俐玲 |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/91938685375757093164 |
Similar Items
-
A Rainfall Study on the northern Taiwan slopeland
by: Lin,Ding Yi, et al.
Published: (1995) -
A study on suitable utilization of slopeland for golf courses
by: CHEN,ZI-E, et al.
Published: (1990) -
A Study of Establishment Models for Estimating Slopeland Rainfall-Runoff and Sediment Yield Using Environmental Indicators
by: Yun-Yu Shen, et al.
Published: (2019) -
Suitability of TRMM Products with Different Temporal Resolution (3-Hourly, Daily, and Monthly) for Rainfall Erosivity Estimation
by: Xianghu Li, et al.
Published: (2020-11-01) -
Regionalization of monthly rainfall erosivity patterns in Switzerland
by: S. Schmidt, et al.
Published: (2016-10-01)