Cases Study of BOT and Government Procurement Act for Sewerage Construction

碩士 === 華梵大學 === 工業工程與經營資訊學系碩士班 === 100 === In order to reduce the financial burden and to improve the efficiency, while the government carries out large-scale public constructions, it also takes the Act for Promotion of Private Participation in Infrastructure Projects (PPIP) to attract the partic...

Full description

Bibliographic Details
Main Authors: Chang Ching Hung, 張敬弘
Other Authors: 吳泓樞
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/03740507452996517742
id ndltd-TW-100HCHT0041004
record_format oai_dc
spelling ndltd-TW-100HCHT00410042015-10-13T20:47:26Z http://ndltd.ncl.edu.tw/handle/03740507452996517742 Cases Study of BOT and Government Procurement Act for Sewerage Construction BOT案與採購案辦理污水建設之案例研究 Chang Ching Hung 張敬弘 碩士 華梵大學 工業工程與經營資訊學系碩士班 100 In order to reduce the financial burden and to improve the efficiency, while the government carries out large-scale public constructions, it also takes the Act for Promotion of Private Participation in Infrastructure Projects (PPIP) to attract the participation from private sector investors. This research is to analyze and compare the Act for Promotion of Private Participation in Infrastructure Projects and the Government Procurement Act from different angles by using various methods including literature review, interview, and case analysis. Two sewerage constructions are as sample cases in this study. One is a project of PPIP based Build-Operate-Transfer (BOT) , and the other is a case of the Procurement Government Act. Their differences are compared and analyzed. Their advantages are pointed out, while their disadvantages are also discussed. The discussed contents include comparison of difference in tender regulations, management mechanism of quality control on public constructions, financial operations analysis, and the impact on domestic industrial structure from procurement. Some conclusions are made. The tender procedure of BOT is prolonged, should it be shortened, and in an open and transparent way. Excessive supervision and management units wouldn’t increase the efficiency. Integrating the management power might be one of the solutions, and the investor is responsible for hiring the supervision and management units. In addition, BOT is not ideal for those industries with potential monopoly, as a reasonable tender offer is always disputable. Keword: BOT, Government Procurement Act, Act for Promotion of Private Participation in Infrastructure Projects 吳泓樞 2012 學位論文 ; thesis 101 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 華梵大學 === 工業工程與經營資訊學系碩士班 === 100 === In order to reduce the financial burden and to improve the efficiency, while the government carries out large-scale public constructions, it also takes the Act for Promotion of Private Participation in Infrastructure Projects (PPIP) to attract the participation from private sector investors. This research is to analyze and compare the Act for Promotion of Private Participation in Infrastructure Projects and the Government Procurement Act from different angles by using various methods including literature review, interview, and case analysis. Two sewerage constructions are as sample cases in this study. One is a project of PPIP based Build-Operate-Transfer (BOT) , and the other is a case of the Procurement Government Act. Their differences are compared and analyzed. Their advantages are pointed out, while their disadvantages are also discussed. The discussed contents include comparison of difference in tender regulations, management mechanism of quality control on public constructions, financial operations analysis, and the impact on domestic industrial structure from procurement. Some conclusions are made. The tender procedure of BOT is prolonged, should it be shortened, and in an open and transparent way. Excessive supervision and management units wouldn’t increase the efficiency. Integrating the management power might be one of the solutions, and the investor is responsible for hiring the supervision and management units. In addition, BOT is not ideal for those industries with potential monopoly, as a reasonable tender offer is always disputable. Keword: BOT, Government Procurement Act, Act for Promotion of Private Participation in Infrastructure Projects
author2 吳泓樞
author_facet 吳泓樞
Chang Ching Hung
張敬弘
author Chang Ching Hung
張敬弘
spellingShingle Chang Ching Hung
張敬弘
Cases Study of BOT and Government Procurement Act for Sewerage Construction
author_sort Chang Ching Hung
title Cases Study of BOT and Government Procurement Act for Sewerage Construction
title_short Cases Study of BOT and Government Procurement Act for Sewerage Construction
title_full Cases Study of BOT and Government Procurement Act for Sewerage Construction
title_fullStr Cases Study of BOT and Government Procurement Act for Sewerage Construction
title_full_unstemmed Cases Study of BOT and Government Procurement Act for Sewerage Construction
title_sort cases study of bot and government procurement act for sewerage construction
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/03740507452996517742
work_keys_str_mv AT changchinghung casesstudyofbotandgovernmentprocurementactforsewerageconstruction
AT zhāngjìnghóng casesstudyofbotandgovernmentprocurementactforsewerageconstruction
AT changchinghung botànyǔcǎigòuànbànlǐwūshuǐjiànshèzhīànlìyánjiū
AT zhāngjìnghóng botànyǔcǎigòuànbànlǐwūshuǐjiànshèzhīànlìyánjiū
_version_ 1718051298077573120