Scheduling unrelated parallel machines with ready times and setup times
碩士 === 逢甲大學 === 工業工程與系統管理學研究所 === 100 === We consider the problem of scheduling n jobs on m unrelated parallel machines with ready times and sequence and machine dependent setup times to minimize total weighted tardiness. We have presented a mixed integer programming (MIP) model that can find optima...
Main Authors: | Feng-Yu Hsieh, 謝逢祐 |
---|---|
Other Authors: | Chi-Wei Lin |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/17559995757919459720 |
Similar Items
-
Scheduling on unrelated parallel machines with sequence dependent setup times
by: Guilherme Etcheverry, et al.
Published: (2014-08-01) -
Scheduling with multi-attribute setup times on unrelated parallel machines
by: Hsing-tzu Tsai, et al.
Published: (2013) -
Unrelated parallel machine scheduling problem with sequence dependent setup times
by: Pei Hsuan Lin, et al.
Published: (2013) -
Preventive Maintenance in Unrelated Parallel Machine Scheduling with Deterioration Effect and Setup Times
by: Behnam Rajaei, et al.
Published: (2017-07-01) -
Learning-Based Metaheuristic for Scheduling Unrelated Parallel Machines With Uncertain Setup Times
by: Chen-Yang Cheng, et al.
Published: (2020-01-01)