Subcontractor Selection of Public Construction Using Importance Performance Analysis

碩士 === 逢甲大學 === 土地管理所 === 100 === Domestic economic slowdown has continued for many years and caused to reduce construction case substantially. However the numbers of construction company is not as significantly reduced and filled with medium and small scale business patterns. In the case that supp...

Full description

Bibliographic Details
Main Authors: Sung-Chuan Huang, 黃崧銓
Other Authors: 謝靜琪
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/28985806348564721289
id ndltd-TW-100FCU05019029
record_format oai_dc
spelling ndltd-TW-100FCU050190292015-10-13T21:27:32Z http://ndltd.ncl.edu.tw/handle/28985806348564721289 Subcontractor Selection of Public Construction Using Importance Performance Analysis 應用重要績效分析法探討公共工程分包商之評選 Sung-Chuan Huang 黃崧銓 碩士 逢甲大學 土地管理所 100 Domestic economic slowdown has continued for many years and caused to reduce construction case substantially. However the numbers of construction company is not as significantly reduced and filled with medium and small scale business patterns. In the case that supply exceeds demand, public construction contract is still the lowest bid awarding, and workers in the sources of instability, poor operating structure of the subcontractors and other uncertainties. In order to reduce costs and risks, contractors choose a long-term cooperation of subcontractors to cooperate and improve business performance. There are no criteria about the selection of subcontractors, but scholars pointed out that contractors and subcontractors combined with strategic alliances will help to improve site performance. The quality of the construction is a standard to measure site performance, in particular public construction for the sake of the quality set quality control personnel and site personnel to perform quality audits.To enhance the performance of quality, quality control personnel and field staff are the key factors. Above to enhance the quality of public works under the premise, we construct the evaluation index of subcontractors by the concept of strategic alliance and questionnaire to quality control staff and field personnel .Then we explore the different attributes of quality control staff and field staff views the selection of indicators and the indicators of subcontractor selection. The final results will be available to the industry reference. In this search, we analysis on different attributes of quality control personnel on the importance and satisfaction of the subcontractors selected indicators of cognitive difference analysis by the independent sample t test and one-way ANOVA. Finally, we investigate the selection of indicators by importance performance analysis. There are 15 indicators located in the first quadrant to maintain area and 5 indicators located in the second quadrant to improvement area.A total of 20 indicators are key indicators of subcontractor selection for this search. 謝靜琪 2012 學位論文 ; thesis 102 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 逢甲大學 === 土地管理所 === 100 === Domestic economic slowdown has continued for many years and caused to reduce construction case substantially. However the numbers of construction company is not as significantly reduced and filled with medium and small scale business patterns. In the case that supply exceeds demand, public construction contract is still the lowest bid awarding, and workers in the sources of instability, poor operating structure of the subcontractors and other uncertainties. In order to reduce costs and risks, contractors choose a long-term cooperation of subcontractors to cooperate and improve business performance. There are no criteria about the selection of subcontractors, but scholars pointed out that contractors and subcontractors combined with strategic alliances will help to improve site performance. The quality of the construction is a standard to measure site performance, in particular public construction for the sake of the quality set quality control personnel and site personnel to perform quality audits.To enhance the performance of quality, quality control personnel and field staff are the key factors. Above to enhance the quality of public works under the premise, we construct the evaluation index of subcontractors by the concept of strategic alliance and questionnaire to quality control staff and field personnel .Then we explore the different attributes of quality control staff and field staff views the selection of indicators and the indicators of subcontractor selection. The final results will be available to the industry reference. In this search, we analysis on different attributes of quality control personnel on the importance and satisfaction of the subcontractors selected indicators of cognitive difference analysis by the independent sample t test and one-way ANOVA. Finally, we investigate the selection of indicators by importance performance analysis. There are 15 indicators located in the first quadrant to maintain area and 5 indicators located in the second quadrant to improvement area.A total of 20 indicators are key indicators of subcontractor selection for this search.
author2 謝靜琪
author_facet 謝靜琪
Sung-Chuan Huang
黃崧銓
author Sung-Chuan Huang
黃崧銓
spellingShingle Sung-Chuan Huang
黃崧銓
Subcontractor Selection of Public Construction Using Importance Performance Analysis
author_sort Sung-Chuan Huang
title Subcontractor Selection of Public Construction Using Importance Performance Analysis
title_short Subcontractor Selection of Public Construction Using Importance Performance Analysis
title_full Subcontractor Selection of Public Construction Using Importance Performance Analysis
title_fullStr Subcontractor Selection of Public Construction Using Importance Performance Analysis
title_full_unstemmed Subcontractor Selection of Public Construction Using Importance Performance Analysis
title_sort subcontractor selection of public construction using importance performance analysis
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/28985806348564721289
work_keys_str_mv AT sungchuanhuang subcontractorselectionofpublicconstructionusingimportanceperformanceanalysis
AT huángsōngquán subcontractorselectionofpublicconstructionusingimportanceperformanceanalysis
AT sungchuanhuang yīngyòngzhòngyàojīxiàofēnxīfǎtàntǎogōnggònggōngchéngfēnbāoshāngzhīpíngxuǎn
AT huángsōngquán yīngyòngzhòngyàojīxiàofēnxīfǎtàntǎogōnggònggōngchéngfēnbāoshāngzhīpíngxuǎn
_version_ 1718063016428175360