Navigating Process for Mold-Manufacturing Scheduling Optimization Using Ant Colony System

碩士 === 中原大學 === 機械工程研究所 === 100 === Mold-manufacturing plays an important role in mold development, and the producing schedule affects the circle of mold development directly. In recent years, the demand for diverse products and earlier delivery date cause the process of mold development become more...

Full description

Bibliographic Details
Main Authors: Chien-Wen Lo, 駱建文
Other Authors: Wen-Ren Jong
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/16166937744626731272
id ndltd-TW-100CYCU5489065
record_format oai_dc
spelling ndltd-TW-100CYCU54890652015-10-13T21:32:36Z http://ndltd.ncl.edu.tw/handle/16166937744626731272 Navigating Process for Mold-Manufacturing Scheduling Optimization Using Ant Colony System 應用蟻群演算法於模具製造排程最佳化之引導流程 Chien-Wen Lo 駱建文 碩士 中原大學 機械工程研究所 100 Mold-manufacturing plays an important role in mold development, and the producing schedule affects the circle of mold development directly. In recent years, the demand for diverse products and earlier delivery date cause the process of mold development become more and more complicated. The two demands also make all components cannot be efficiently managed or arranged during mold producing. How to arrange producing schedule turns into a challenging issue of combinatorial optimization. Meta Algorithms such as Simulated Annealing, Genetic Algorithm and Ant Colony System are tried to be applied in producing schedule. Among these, Ant Colony System is an optimization method based on simulating the foraging behavior of ants. It’s been widely used in solving optimization problem and had better results. Thus, Ant Colony System is applied here to improve mold producing schedule in response to demands and changes in market without sharply rising cost. This research focuses on finding out an optimization flow of producing schedule in mold development under CAD software structure. Mold-manufacturing is a Job-shop Scheduling Problem. Due to the order of processing elements with limited machine, this paper tries to conclude a best way to compute mold-manufacturing schedule by adopting the searching ability of Ant Colony System. In this way, time of producing mold will be shorter to lower production cost and enhance business competitiveness. This study can also provide a deeper look at the restriction of planning mold-manufacturing and the efficiency of using resources. Through following the guiding interface to finish the steps and timing estimation of algorithm, processing time and recommended values are provided according to the formula of processing theory when cutting parameters are inputted. Then those planned components can be arranged in an optimized way with mold-manufacturing schedule coping with working schedule. Enhancing the accuracy of schedule estimating integrates the mold designing system with producing system, so that the whole system becomes a collaborative and efficient one. Thanks to the visible information of schedule for production manager easily arrange schedule, processes in factories are able to run quite smoothly. Wen-Ren Jong 鍾文仁 2012 學位論文 ; thesis 89 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 中原大學 === 機械工程研究所 === 100 === Mold-manufacturing plays an important role in mold development, and the producing schedule affects the circle of mold development directly. In recent years, the demand for diverse products and earlier delivery date cause the process of mold development become more and more complicated. The two demands also make all components cannot be efficiently managed or arranged during mold producing. How to arrange producing schedule turns into a challenging issue of combinatorial optimization. Meta Algorithms such as Simulated Annealing, Genetic Algorithm and Ant Colony System are tried to be applied in producing schedule. Among these, Ant Colony System is an optimization method based on simulating the foraging behavior of ants. It’s been widely used in solving optimization problem and had better results. Thus, Ant Colony System is applied here to improve mold producing schedule in response to demands and changes in market without sharply rising cost. This research focuses on finding out an optimization flow of producing schedule in mold development under CAD software structure. Mold-manufacturing is a Job-shop Scheduling Problem. Due to the order of processing elements with limited machine, this paper tries to conclude a best way to compute mold-manufacturing schedule by adopting the searching ability of Ant Colony System. In this way, time of producing mold will be shorter to lower production cost and enhance business competitiveness. This study can also provide a deeper look at the restriction of planning mold-manufacturing and the efficiency of using resources. Through following the guiding interface to finish the steps and timing estimation of algorithm, processing time and recommended values are provided according to the formula of processing theory when cutting parameters are inputted. Then those planned components can be arranged in an optimized way with mold-manufacturing schedule coping with working schedule. Enhancing the accuracy of schedule estimating integrates the mold designing system with producing system, so that the whole system becomes a collaborative and efficient one. Thanks to the visible information of schedule for production manager easily arrange schedule, processes in factories are able to run quite smoothly.
author2 Wen-Ren Jong
author_facet Wen-Ren Jong
Chien-Wen Lo
駱建文
author Chien-Wen Lo
駱建文
spellingShingle Chien-Wen Lo
駱建文
Navigating Process for Mold-Manufacturing Scheduling Optimization Using Ant Colony System
author_sort Chien-Wen Lo
title Navigating Process for Mold-Manufacturing Scheduling Optimization Using Ant Colony System
title_short Navigating Process for Mold-Manufacturing Scheduling Optimization Using Ant Colony System
title_full Navigating Process for Mold-Manufacturing Scheduling Optimization Using Ant Colony System
title_fullStr Navigating Process for Mold-Manufacturing Scheduling Optimization Using Ant Colony System
title_full_unstemmed Navigating Process for Mold-Manufacturing Scheduling Optimization Using Ant Colony System
title_sort navigating process for mold-manufacturing scheduling optimization using ant colony system
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/16166937744626731272
work_keys_str_mv AT chienwenlo navigatingprocessformoldmanufacturingschedulingoptimizationusingantcolonysystem
AT luòjiànwén navigatingprocessformoldmanufacturingschedulingoptimizationusingantcolonysystem
AT chienwenlo yīngyòngyǐqúnyǎnsuànfǎyúmójùzhìzàopáichéngzuìjiāhuàzhīyǐndǎoliúchéng
AT luòjiànwén yīngyòngyǐqúnyǎnsuànfǎyúmójùzhìzàopáichéngzuìjiāhuàzhīyǐndǎoliúchéng
_version_ 1718065493697363968