Optimal Production Inventory Replenishment Policy Considering Production Postponement and Rework

碩士 === 中原大學 === 工業與系統工程研究所 === 100 === This paper presents a basic framework for a two-stage supply chain with backorder, rework and scrap. The manufacturer produces a generic component, and orders additional components from its suppliers. Afterward, the manufacturer assembles the end-products with...

Full description

Bibliographic Details
Main Authors: Sheng-Jung Hsueh, 薛勝榮
Other Authors: Hui-Ming Wee
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/29668996570307582836