A Study Of Public Construction Quality Management System Applied In The Tower Of The Petrochemical Plant
碩士 === 正修科技大學 === 營建工程研究所 === 100 === This study is to develop a critical quality item of petrochemical plant tower for the safety and quality inspection , based on “Public construction quality management system”. Applied to the tower of petrochemical plant which includes construction method, cons...
Main Authors: | Chung, Jihwen, 鍾日文 |
---|---|
Other Authors: | Wang,Chienchih |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/08376851698520523102 |
Similar Items
-
Collaborative Operation Mode of Petrochemical Plant Overhaul Process -Take the Aromatic Hydrocarbon Plant Tower for Example
by: CHUNG,CHANG-CHANG, et al.
Published: (2019) -
Six Sigma Methodology Applied In Petrochemical Industry-With Petrochemical plant as a case study
by: Jerry Huang, et al.
Published: (2002) -
The Study of Public Construction QualityManagement System Executed by the Government
by: Hsin-yi Chung, et al.
Published: (2006) -
The Study of Planning and Construction Management of Petrochemical Storage Tank—An Example of PCM Petrochemical Company
by: LIN, Hsi-Cheng, et al.
Published: (2017) -
Field Inspection on the Leaking of Volatile Organic Compounds in Petrochemical Plants
by: Ming-chih Chung, et al.
Published: (2015)