The Application of ORM and TRIZ to prevent and solve The delay of production scheme
碩士 === 正修科技大學 === 工業工程與管理研究所 === 100 === Now a day, the competition in various industrials became more and more intensely. SO how to offer customers with promised quality, quantity and on time schedule is important .Therefore, the manufacturing Resource. Management in machining industrial is a core...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/80465691477306369072 |
id |
ndltd-TW-100CSU00117007 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-100CSU001170072015-10-13T21:01:55Z http://ndltd.ncl.edu.tw/handle/80465691477306369072 The Application of ORM and TRIZ to prevent and solve The delay of production scheme 運用風險管理及TRIZ預防及解決排程問題 Lu,Tzung-Ying 呂宗穎 碩士 正修科技大學 工業工程與管理研究所 100 Now a day, the competition in various industrials became more and more intensely. SO how to offer customers with promised quality, quantity and on time schedule is important .Therefore, the manufacturing Resource. Management in machining industrial is a core issue and will be studied in this thesis. Both operational Risk Management (ORM) and TRIZ are used to find out control methods after risks were found and evaluated, the results shown that the TRIZ are better than in this application. Wu,Fuh-Eau 吳富堯 2012 學位論文 ; thesis 58 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 正修科技大學 === 工業工程與管理研究所 === 100 === Now a day, the competition in various industrials became more and more intensely. SO how to offer customers with promised quality, quantity and on time schedule is important .Therefore, the manufacturing Resource.
Management in machining industrial is a core issue and will be studied in this thesis.
Both operational Risk Management (ORM) and TRIZ are used to find out control methods after risks were found and evaluated, the results shown that the TRIZ are better than in this application.
|
author2 |
Wu,Fuh-Eau |
author_facet |
Wu,Fuh-Eau Lu,Tzung-Ying 呂宗穎 |
author |
Lu,Tzung-Ying 呂宗穎 |
spellingShingle |
Lu,Tzung-Ying 呂宗穎 The Application of ORM and TRIZ to prevent and solve The delay of production scheme |
author_sort |
Lu,Tzung-Ying |
title |
The Application of ORM and TRIZ to prevent and solve The delay of production scheme |
title_short |
The Application of ORM and TRIZ to prevent and solve The delay of production scheme |
title_full |
The Application of ORM and TRIZ to prevent and solve The delay of production scheme |
title_fullStr |
The Application of ORM and TRIZ to prevent and solve The delay of production scheme |
title_full_unstemmed |
The Application of ORM and TRIZ to prevent and solve The delay of production scheme |
title_sort |
application of orm and triz to prevent and solve the delay of production scheme |
publishDate |
2012 |
url |
http://ndltd.ncl.edu.tw/handle/80465691477306369072 |
work_keys_str_mv |
AT lutzungying theapplicationoformandtriztopreventandsolvethedelayofproductionscheme AT lǚzōngyǐng theapplicationoformandtriztopreventandsolvethedelayofproductionscheme AT lutzungying yùnyòngfēngxiǎnguǎnlǐjítrizyùfángjíjiějuépáichéngwèntí AT lǚzōngyǐng yùnyòngfēngxiǎnguǎnlǐjítrizyùfángjíjiějuépáichéngwèntí AT lutzungying applicationoformandtriztopreventandsolvethedelayofproductionscheme AT lǚzōngyǐng applicationoformandtriztopreventandsolvethedelayofproductionscheme |
_version_ |
1718053833238642688 |