Engineering contract dispute and change the allocation of risk research
碩士 === 中華科技大學 === 土木防災工程研究所 === 100 === The project of application, the original there are too many uncertainties \ the controversial, or both can be expected or unexpected, would be expected of the parties before a dispute has arisen, that is, efforts should be made to exclude and to clarify, if it...
Main Authors: | Lin,Tung,Ying, 林東瑩 |
---|---|
Other Authors: | HONG,JHIH-PING |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/64498137123348522988 |
Similar Items
-
Risk Allocation and Common Disputes of Construction Contracts
by: Mei-Chun Ku, et al.
Published: (2003) -
Research on Engineering Contract Dispute Project
by: Ching,Kuo-Hsien, et al.
Published: (2018) -
A study on litigation efficiency for dispute of risk allocation under construction contract
by: Hung-PoChiang, et al.
Published: (2017) -
The Study of Construction Disputes of Lump-sum Contract in Construction
by: Tung-Peng Wu, et al.
Published: (2012) -
A Study on Risk Allocation and Optimized Dispute Resolution Mechanism for Public Construction Contracts
by: Ting-Kuei Lee, et al.
Published: (2013)