A Study of New Plant Project Management for LED Industry in China — A Case Study of W Company
碩士 === 萬能科技大學 === 經營管理研究所 === 99 === Company in the LED industry find that with technology renewing accelerate, life cycle of the product unceasingly reduces. Company has to grip the opportunity of new releasing and gain the market share. In order to get the competitive advantage and reduce the prod...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/76065217120107123548 |
id |
ndltd-TW-099VNU05457045 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-099VNU054570452015-10-13T20:52:04Z http://ndltd.ncl.edu.tw/handle/76065217120107123548 A Study of New Plant Project Management for LED Industry in China — A Case Study of W Company LED產業赴中國建廠專案管理之研究—以W公司為例 Chuan-Wan Chiu 邱全萬 碩士 萬能科技大學 經營管理研究所 99 Company in the LED industry find that with technology renewing accelerate, life cycle of the product unceasingly reduces. Company has to grip the opportunity of new releasing and gain the market share. In order to get the competitive advantage and reduce the production cost, one of the important issues concerning the competitiveness of the companies is the decision to build a new plant. Expanding the offshore business has some uncertainties; therefore, integrating the current resource with project management on plant-construction under good operation procedures can not only control the constructing progression and quality effectively. but reduce the cost as well as risk. This will make the subsequent business running more flexible. As there are less academic research, limited reference information and poor information exchange route related to the new building plant project management of LED industry. This research is aimed at the LED factory of W company in China, and based on systematically compiling the procedures and means for LED factory construction management, and discussing the five key issues - cost、schedule、quality 、safety and efficiency - playing the roles in the construction management, and focuses on the personal working experiences and objects to facility’s system project, the related bibliographies of the new building plant project management of LED industry and coordinate all kinds of project management for working. Hopefully the conclusion of this study that we got from executing the W company case a reference mode that the project administrators will be the best project management model for the LED factory construction project management. Shiang-Tai Liu 劉祥泰 2010 學位論文 ; thesis 80 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 萬能科技大學 === 經營管理研究所 === 99 === Company in the LED industry find that with technology renewing accelerate, life cycle of the product unceasingly reduces. Company has to grip the opportunity of new releasing and gain the market share. In order to get the competitive advantage and reduce the production cost, one of the important issues concerning the competitiveness of the companies is the decision to build a new plant.
Expanding the offshore business has some uncertainties; therefore, integrating the current resource with project management on plant-construction under good operation procedures can not only control the constructing progression and quality effectively. but reduce the cost as well as risk. This will make the subsequent business running more flexible.
As there are less academic research, limited reference information and poor information exchange route related to the new building plant project management of LED industry. This research is aimed at the LED factory of W company in China, and based on systematically compiling the procedures and means for LED factory construction management, and discussing the five key issues - cost、schedule、quality 、safety and efficiency - playing the roles in the construction management, and focuses on the personal working experiences and objects to facility’s system project, the related bibliographies of the new building plant project management of LED industry and coordinate all kinds of project management for working.
Hopefully the conclusion of this study that we got from executing the W company case a reference mode that the project administrators will be the best project management model for the LED factory construction project management.
|
author2 |
Shiang-Tai Liu |
author_facet |
Shiang-Tai Liu Chuan-Wan Chiu 邱全萬 |
author |
Chuan-Wan Chiu 邱全萬 |
spellingShingle |
Chuan-Wan Chiu 邱全萬 A Study of New Plant Project Management for LED Industry in China — A Case Study of W Company |
author_sort |
Chuan-Wan Chiu |
title |
A Study of New Plant Project Management for LED Industry in China — A Case Study of W Company |
title_short |
A Study of New Plant Project Management for LED Industry in China — A Case Study of W Company |
title_full |
A Study of New Plant Project Management for LED Industry in China — A Case Study of W Company |
title_fullStr |
A Study of New Plant Project Management for LED Industry in China — A Case Study of W Company |
title_full_unstemmed |
A Study of New Plant Project Management for LED Industry in China — A Case Study of W Company |
title_sort |
study of new plant project management for led industry in china — a case study of w company |
publishDate |
2010 |
url |
http://ndltd.ncl.edu.tw/handle/76065217120107123548 |
work_keys_str_mv |
AT chuanwanchiu astudyofnewplantprojectmanagementforledindustryinchinaacasestudyofwcompany AT qiūquánwàn astudyofnewplantprojectmanagementforledindustryinchinaacasestudyofwcompany AT chuanwanchiu ledchǎnyèfùzhōngguójiànchǎngzhuānànguǎnlǐzhīyánjiūyǐwgōngsīwèilì AT qiūquánwàn ledchǎnyèfùzhōngguójiànchǎngzhuānànguǎnlǐzhīyánjiūyǐwgōngsīwèilì AT chuanwanchiu studyofnewplantprojectmanagementforledindustryinchinaacasestudyofwcompany AT qiūquánwàn studyofnewplantprojectmanagementforledindustryinchinaacasestudyofwcompany |
_version_ |
1718053114298236928 |