Development of Back-Propagation Network Model for Estimation of Architecture Construction Project Durations
碩士 === 淡江大學 === 土木工程學系碩士班 === 99 === To get projects done on time, within budget and at a certain quality level has been the main concerns of a construction project. However unlike budget and quality, there is neither a systematic way to estimate duration of a project nor standard specifications to...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/87670019192907053927 |
id |
ndltd-TW-099TKU05015025 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-099TKU050150252016-04-11T04:22:23Z http://ndltd.ncl.edu.tw/handle/87670019192907053927 Development of Back-Propagation Network Model for Estimation of Architecture Construction Project Durations 以倒傳遞類神經網路模型建置建築工程專案時程估算系統之研究 Chun-Ju Wang 王俊儒 碩士 淡江大學 土木工程學系碩士班 99 To get projects done on time, within budget and at a certain quality level has been the main concerns of a construction project. However unlike budget and quality, there is neither a systematic way to estimate duration of a project nor standard specifications to be followed. Therefore this research aims at establishing a duration estimating model by analyzing the WBS and identifying the duration of different categories of architecture construction projects with application of expert interviews. Summarizing the duration influencing factors, it then applies Back-Propagation Network technique with practical cases to implement the model. Su-Ling Fan 范素玲 2011 學位論文 ; thesis 85 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 淡江大學 === 土木工程學系碩士班 === 99 === To get projects done on time, within budget and at a certain quality level has been the main concerns of a construction project. However unlike budget and quality, there is neither a systematic way to estimate duration of a project nor standard specifications to be followed.
Therefore this research aims at establishing a duration estimating model by analyzing the WBS and identifying the duration of different categories of architecture construction projects with application of expert interviews.
Summarizing the duration influencing factors, it then applies Back-Propagation Network technique with practical cases to implement the model.
|
author2 |
Su-Ling Fan |
author_facet |
Su-Ling Fan Chun-Ju Wang 王俊儒 |
author |
Chun-Ju Wang 王俊儒 |
spellingShingle |
Chun-Ju Wang 王俊儒 Development of Back-Propagation Network Model for Estimation of Architecture Construction Project Durations |
author_sort |
Chun-Ju Wang |
title |
Development of Back-Propagation Network Model for Estimation of Architecture Construction Project Durations |
title_short |
Development of Back-Propagation Network Model for Estimation of Architecture Construction Project Durations |
title_full |
Development of Back-Propagation Network Model for Estimation of Architecture Construction Project Durations |
title_fullStr |
Development of Back-Propagation Network Model for Estimation of Architecture Construction Project Durations |
title_full_unstemmed |
Development of Back-Propagation Network Model for Estimation of Architecture Construction Project Durations |
title_sort |
development of back-propagation network model for estimation of architecture construction project durations |
publishDate |
2011 |
url |
http://ndltd.ncl.edu.tw/handle/87670019192907053927 |
work_keys_str_mv |
AT chunjuwang developmentofbackpropagationnetworkmodelforestimationofarchitectureconstructionprojectdurations AT wángjùnrú developmentofbackpropagationnetworkmodelforestimationofarchitectureconstructionprojectdurations AT chunjuwang yǐdàochuándìlèishénjīngwǎnglùmóxíngjiànzhìjiànzhúgōngchéngzhuānànshíchénggūsuànxìtǒngzhīyánjiū AT wángjùnrú yǐdàochuándìlèishénjīngwǎnglùmóxíngjiànzhìjiànzhúgōngchéngzhuānànshíchénggūsuànxìtǒngzhīyánjiū |
_version_ |
1718220636809068544 |