Ground surface settlement of Double-O-tube shield tunnel for Airport Access MRT in Taipei Basin

碩士 === 國立臺北科技大學 === 土木與防災研究所 === 99 === This study evaluated the ground surface settlement caused by double-o-tube shield tunnel construction, using Taoyuan International Airport MRT Line Taipei-Sanchung Section CA450A as an example. PLAXIS 2D software of the infinite element method was used to cond...

Full description

Bibliographic Details
Main Authors: Wan-yi Ka, 柯婉伊
Other Authors: 陳水龍
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/3jxzaa