The research on building integral moving engineeringof existing buildings of technology anddecision-making process

碩士 === 國立高雄大學 === 都市發展與建築研究所 === 99 === The research main purpose is to understand adopted policy before moving integral buildings, usage for after-moving and its establishment.Moving integral building the construction process for the collation and management elements in Taiwan, and will provide ano...

Full description

Bibliographic Details
Main Authors: Tz-Ling Huang, 黃子凌
Other Authors: Shyh-Meng Huang
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/97539058796668311026
id ndltd-TW-099NUK05347002
record_format oai_dc
spelling ndltd-TW-099NUK053470022015-10-30T04:04:47Z http://ndltd.ncl.edu.tw/handle/97539058796668311026 The research on building integral moving engineeringof existing buildings of technology anddecision-making process 既有建築物整體遷移技術與決策流程之研究 Tz-Ling Huang 黃子凌 碩士 國立高雄大學 都市發展與建築研究所 99 The research main purpose is to understand adopted policy before moving integral buildings, usage for after-moving and its establishment.Moving integral building the construction process for the collation and management elements in Taiwan, and will provide another demolition of the building to be dismantled. Main research methods used literature review, case studies and field research. Public buildings has been moved are selected as cases in the studies , such as Taipei Workshop, old train station of Kaohsiung, old department of Pharmacy hall of National Taiwan University, and Chiayi Vision Museum. The results showed most moving of public building are social-oriented, and after-moving buildings are used for the exhibition in transition. According to Construction Method, cut-construction method could be selected to use in Concrete Buildings, but Construction Method of up-down or all excavation could be selected to use in buildings whose structure are more fragile. Shyh-Meng Huang 黃世孟 2011 學位論文 ; thesis 191 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄大學 === 都市發展與建築研究所 === 99 === The research main purpose is to understand adopted policy before moving integral buildings, usage for after-moving and its establishment.Moving integral building the construction process for the collation and management elements in Taiwan, and will provide another demolition of the building to be dismantled. Main research methods used literature review, case studies and field research. Public buildings has been moved are selected as cases in the studies , such as Taipei Workshop, old train station of Kaohsiung, old department of Pharmacy hall of National Taiwan University, and Chiayi Vision Museum. The results showed most moving of public building are social-oriented, and after-moving buildings are used for the exhibition in transition. According to Construction Method, cut-construction method could be selected to use in Concrete Buildings, but Construction Method of up-down or all excavation could be selected to use in buildings whose structure are more fragile.
author2 Shyh-Meng Huang
author_facet Shyh-Meng Huang
Tz-Ling Huang
黃子凌
author Tz-Ling Huang
黃子凌
spellingShingle Tz-Ling Huang
黃子凌
The research on building integral moving engineeringof existing buildings of technology anddecision-making process
author_sort Tz-Ling Huang
title The research on building integral moving engineeringof existing buildings of technology anddecision-making process
title_short The research on building integral moving engineeringof existing buildings of technology anddecision-making process
title_full The research on building integral moving engineeringof existing buildings of technology anddecision-making process
title_fullStr The research on building integral moving engineeringof existing buildings of technology anddecision-making process
title_full_unstemmed The research on building integral moving engineeringof existing buildings of technology anddecision-making process
title_sort research on building integral moving engineeringof existing buildings of technology anddecision-making process
publishDate 2011
url http://ndltd.ncl.edu.tw/handle/97539058796668311026
work_keys_str_mv AT tzlinghuang theresearchonbuildingintegralmovingengineeringofexistingbuildingsoftechnologyanddecisionmakingprocess
AT huángzilíng theresearchonbuildingintegralmovingengineeringofexistingbuildingsoftechnologyanddecisionmakingprocess
AT tzlinghuang jìyǒujiànzhúwùzhěngtǐqiānyíjìshùyǔjuécèliúchéngzhīyánjiū
AT huángzilíng jìyǒujiànzhúwùzhěngtǐqiānyíjìshùyǔjuécèliúchéngzhīyánjiū
AT tzlinghuang researchonbuildingintegralmovingengineeringofexistingbuildingsoftechnologyanddecisionmakingprocess
AT huángzilíng researchonbuildingintegralmovingengineeringofexistingbuildingsoftechnologyanddecisionmakingprocess
_version_ 1718115328296222720