Using parallel programming paradigms to reduce errors of correlated simulation in estimation and scheduling

碩士 === 國立臺灣科技大學 === 營建工程系 === 99 === The success of a construction project can be determined by aspects of its scheduling , costs and quality. Its quality standards have already been specified the moment the contract is signed. Therefore, how to plan the schedule and control the costs have become an...