Simulation Analysis for Automated Material Handling System between COF Process and MA Process in Panel Module Processes
碩士 === 國立臺灣科技大學 === 工業管理系 === 99 === To enhance the productivity, most leading officials always try to build the next generation panel factory to reduce cost for each panel. Nevertheless, the large-size glass substrates are not easy to transport by manual handling. In order to promise the yield rate...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/11802911474462625274 |
Summary: | 碩士 === 國立臺灣科技大學 === 工業管理系 === 99 === To enhance the productivity, most leading officials always try to build the next generation panel factory to reduce cost for each panel. Nevertheless, the large-size glass substrates are not easy to transport by manual handling. In order to promise the yield rate of final product and no manpower cost spend in transport, this heavy task can be accomplished by an automated material handling system(AMHS).
This research studies an AMHS handling between COF process and MA process in a module panel manufacturer located in Taiwan. According to the existing layout of plant and machine facilities, discuss different dispatching method to get the better performance. Object-oriented based unified modeling language(UML)simulation models from eM-Plant company are used. We consider the different dispatching rules and the level in the track as the impact of handling performance.
The result shows the dispatching method and suitable level could make MA process more flexibility and using the process time of COF could decide the number of cassette in the track. Therefore, it could reduce the phenomenon of process blocking and make the manufacture procedure more stable.
|
---|