The Gap of Technology and the Convinces of Public: The Case of Tsengwen Transwatershed Diversion
碩士 === 國立臺灣大學 === 新聞研究所 === 99 === There’s a Transwatershed Diversion of Tsengwen Reservoir at Kaohsiung, and the budget of this work was over 10 billion (TD). Since 10 years ago, the work was being planned, it is difficult to obtain the trust of the inhabitants. They oppose the Transwatershed Div...
Main Authors: | Hsing-Hsuan Chen, 陳幸萱 |
---|---|
Other Authors: | 陳宏宇 |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/33353514250862687633 |
Similar Items
-
A Study on the Effects of Transwatershed Diversion of Da-an River Shih-lin Weir on the Downstream Agriculture Irrigation water
by: Ming-Hsin Wang, et al.
Published: (2011) -
Assessment of Inflow for the Transbasin Diversion Tunnel of Tsengwen Reservoir
by: Wen-Jui Kung, et al.
Published: (2005) -
The Influence of Knowledge Construction and Institution Framework for Environmental Governance: The Cases Study of Meinong Dam and Tsengwen Cross-watershed Diversion
by: Yin-TaiChen, et al.
Published: (2014) -
Numerical Simulation of the Spillway Discharge of the Tsengwen Reservoir
by: Yu-ChiLin, et al.
Published: (2017) -
Evaluation on the Landslide Potential in the Tsengwen Reservoir Watershed
by: Kun-Pao Kang, et al.
Published: (2009)