Study of Schedule Management Planning & On-site Control on Construction of High-tech Facility -Mainly on Semiconductor & Solar Fab
碩士 === 國立臺灣大學 === 土木工程學研究所 === 99 === Due to the competitive market and the characteristic of short life-cycles in high-tech semiconductor products, companies nowadays are prompted to construct manufacturing facilities in a fast manner for securing a place in the market share. As a result, the time...
Main Authors: | Chi-Yang Lei, 雷啟洋 |
---|---|
Other Authors: | Lu-Maan Chang |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/41554900091540297223 |
Similar Items
-
Build Up a Model to Shorten High-Tech Construction Plant &Office -Mainly on TFT-LCD &Semiconductor Fab in STSP
by: Ming-Hsin Wang, et al.
Published: (2004) -
Build Up a Model to Shorten High-Tech Construction Plant &Office -Mainly on TFT-LCD &Semiconductor Fab in STSP
by: Ming-Hsin Wang, et al.
Published: (2004) -
Managing the Building of a High-Tech Semiconductor Fab in CTSP
by: 張以達
Published: (2005) -
Resource-Based Scheduling Simulation-Semiconductor Fab Substructure Construction Case
by: Jeanne Hsieh, et al.
Published: (2014) -
OPTIMAL PREVENTIVE MAINTENANCE SCHEDULING IN SEMICONDUCTOR FABS
by: CRABTREE, JASON PAUL
Published: (2003)