Study of Schedule Management Planning & On-site Control on Construction of High-tech Facility -Mainly on Semiconductor & Solar Fab

碩士 === 國立臺灣大學 === 土木工程學研究所 === 99 === Due to the competitive market and the characteristic of short life-cycles in high-tech semiconductor products, companies nowadays are prompted to construct manufacturing facilities in a fast manner for securing a place in the market share. As a result, the time...

Full description

Bibliographic Details
Main Authors: Chi-Yang Lei, 雷啟洋
Other Authors: Lu-Maan Chang
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/41554900091540297223
id ndltd-TW-099NTU05015112
record_format oai_dc
spelling ndltd-TW-099NTU050151122015-10-16T04:03:08Z http://ndltd.ncl.edu.tw/handle/41554900091540297223 Study of Schedule Management Planning & On-site Control on Construction of High-tech Facility -Mainly on Semiconductor & Solar Fab 高科技廠房施工時程管理規劃與現場管控之研究-以半導體與太陽能廠房為例 Chi-Yang Lei 雷啟洋 碩士 國立臺灣大學 土木工程學研究所 99 Due to the competitive market and the characteristic of short life-cycles in high-tech semiconductor products, companies nowadays are prompted to construct manufacturing facilities in a fast manner for securing a place in the market share. As a result, the time period invested in planning and construction is much shorter than that in public constructions, and many problems can occur in interface integration, communication, construction, and etc. Therefore, complete and suitable management tools become essential in solving these problems. In a high-tech facility construction project, “schedule management” is the primary issue. There are many schedule management tools and methods demonstrated in PMBOK (Project Management Body of Knowledge, a guide published by Project Management Institute), such as critical path method, arrow diagram method, earn value management, and etc. In real case scenarios, however, a schedule engineer must have the flexibility to adjust the principles when these methods are integrated to specific high-tech facility projects. Adopting the viewpoint of PCM (Professional Construction Management), this research first clarified the definitions and the characteristics of high-tech facility construction projects. Then, major problems and possible solutions of the schedule management in a construction process were discussed. Through a combination of in-depth literature review, expert interview and case study, problems were investigated and solutions were proposed. The key factors in schedule management can be summarized as the following four issues in high-tech facility construction project: fast track construction and tight working hours, interface integration, resource dispatch and schedule planning and control. With detailed data collection and analysis, the study demonstrates the logic and targets in schedule management corresponding to specific high-tech facility projects. The results found in this research hopefully provide useful, and could serve as a useful reference for future high-tech facility construction projects. Lu-Maan Chang 張陸滿 2011 學位論文 ; thesis 91 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 土木工程學研究所 === 99 === Due to the competitive market and the characteristic of short life-cycles in high-tech semiconductor products, companies nowadays are prompted to construct manufacturing facilities in a fast manner for securing a place in the market share. As a result, the time period invested in planning and construction is much shorter than that in public constructions, and many problems can occur in interface integration, communication, construction, and etc. Therefore, complete and suitable management tools become essential in solving these problems. In a high-tech facility construction project, “schedule management” is the primary issue. There are many schedule management tools and methods demonstrated in PMBOK (Project Management Body of Knowledge, a guide published by Project Management Institute), such as critical path method, arrow diagram method, earn value management, and etc. In real case scenarios, however, a schedule engineer must have the flexibility to adjust the principles when these methods are integrated to specific high-tech facility projects. Adopting the viewpoint of PCM (Professional Construction Management), this research first clarified the definitions and the characteristics of high-tech facility construction projects. Then, major problems and possible solutions of the schedule management in a construction process were discussed. Through a combination of in-depth literature review, expert interview and case study, problems were investigated and solutions were proposed. The key factors in schedule management can be summarized as the following four issues in high-tech facility construction project: fast track construction and tight working hours, interface integration, resource dispatch and schedule planning and control. With detailed data collection and analysis, the study demonstrates the logic and targets in schedule management corresponding to specific high-tech facility projects. The results found in this research hopefully provide useful, and could serve as a useful reference for future high-tech facility construction projects.
author2 Lu-Maan Chang
author_facet Lu-Maan Chang
Chi-Yang Lei
雷啟洋
author Chi-Yang Lei
雷啟洋
spellingShingle Chi-Yang Lei
雷啟洋
Study of Schedule Management Planning & On-site Control on Construction of High-tech Facility -Mainly on Semiconductor & Solar Fab
author_sort Chi-Yang Lei
title Study of Schedule Management Planning & On-site Control on Construction of High-tech Facility -Mainly on Semiconductor & Solar Fab
title_short Study of Schedule Management Planning & On-site Control on Construction of High-tech Facility -Mainly on Semiconductor & Solar Fab
title_full Study of Schedule Management Planning & On-site Control on Construction of High-tech Facility -Mainly on Semiconductor & Solar Fab
title_fullStr Study of Schedule Management Planning & On-site Control on Construction of High-tech Facility -Mainly on Semiconductor & Solar Fab
title_full_unstemmed Study of Schedule Management Planning & On-site Control on Construction of High-tech Facility -Mainly on Semiconductor & Solar Fab
title_sort study of schedule management planning & on-site control on construction of high-tech facility -mainly on semiconductor & solar fab
publishDate 2011
url http://ndltd.ncl.edu.tw/handle/41554900091540297223
work_keys_str_mv AT chiyanglei studyofschedulemanagementplanningonsitecontrolonconstructionofhightechfacilitymainlyonsemiconductorsolarfab
AT léiqǐyáng studyofschedulemanagementplanningonsitecontrolonconstructionofhightechfacilitymainlyonsemiconductorsolarfab
AT chiyanglei gāokējìchǎngfángshīgōngshíchéngguǎnlǐguīhuàyǔxiànchǎngguǎnkòngzhīyánjiūyǐbàndǎotǐyǔtàiyángnéngchǎngfángwèilì
AT léiqǐyáng gāokējìchǎngfángshīgōngshíchéngguǎnlǐguīhuàyǔxiànchǎngguǎnkòngzhīyánjiūyǐbàndǎotǐyǔtàiyángnéngchǎngfángwèilì
_version_ 1718091651992256512