Study on Strategies of Construction Obstacles in Sewerge Household Connection

碩士 === 國立臺灣海洋大學 === 河海工程學系 === 99 === To improve the quality of water polluted in domestic sewage and preserve the residential environment, the government accelerated the sewage construction and set the goal for increasing the household connections prevalence rate 3% per year since 2009.The sewerage...

Full description

Bibliographic Details
Main Author: 張雄仁
Other Authors: Shuh-Gi Chern
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/14468250032563947543
id ndltd-TW-099NTOU5192087
record_format oai_dc
spelling ndltd-TW-099NTOU51920872015-10-16T04:05:33Z http://ndltd.ncl.edu.tw/handle/14468250032563947543 Study on Strategies of Construction Obstacles in Sewerge Household Connection 污水下水道用戶接管施工障礙對策研究 張雄仁 碩士 國立臺灣海洋大學 河海工程學系 99 To improve the quality of water polluted in domestic sewage and preserve the residential environment, the government accelerated the sewage construction and set the goal for increasing the household connections prevalence rate 3% per year since 2009.The sewerage construction is one of the Modernity Indices of a Nation. However, reasons include the started late sewage construction, the narrow lanes behind buildings, over builds without license and the highly density of the livelihood pipelines in road, the household connection in Taiwan isn’t carried out rapidly. That’s all seriously effect the promotion of the household connections prevalence rate and the achievement of sewage disposal. This study is to discuss the reasons of delayed construction and to find out the strategies through collecting the information about the solution of construction barrier of propelling and the household connections. The result can be a reference for the local governments implementing household connection works. Shuh-Gi Chern ku-Yu Chang 陳俶季 張固宇 2011 學位論文 ; thesis 103 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣海洋大學 === 河海工程學系 === 99 === To improve the quality of water polluted in domestic sewage and preserve the residential environment, the government accelerated the sewage construction and set the goal for increasing the household connections prevalence rate 3% per year since 2009.The sewerage construction is one of the Modernity Indices of a Nation. However, reasons include the started late sewage construction, the narrow lanes behind buildings, over builds without license and the highly density of the livelihood pipelines in road, the household connection in Taiwan isn’t carried out rapidly. That’s all seriously effect the promotion of the household connections prevalence rate and the achievement of sewage disposal. This study is to discuss the reasons of delayed construction and to find out the strategies through collecting the information about the solution of construction barrier of propelling and the household connections. The result can be a reference for the local governments implementing household connection works.
author2 Shuh-Gi Chern
author_facet Shuh-Gi Chern
張雄仁
author 張雄仁
spellingShingle 張雄仁
Study on Strategies of Construction Obstacles in Sewerge Household Connection
author_sort 張雄仁
title Study on Strategies of Construction Obstacles in Sewerge Household Connection
title_short Study on Strategies of Construction Obstacles in Sewerge Household Connection
title_full Study on Strategies of Construction Obstacles in Sewerge Household Connection
title_fullStr Study on Strategies of Construction Obstacles in Sewerge Household Connection
title_full_unstemmed Study on Strategies of Construction Obstacles in Sewerge Household Connection
title_sort study on strategies of construction obstacles in sewerge household connection
publishDate 2011
url http://ndltd.ncl.edu.tw/handle/14468250032563947543
work_keys_str_mv AT zhāngxióngrén studyonstrategiesofconstructionobstaclesinsewergehouseholdconnection
AT zhāngxióngrén wūshuǐxiàshuǐdàoyònghùjiēguǎnshīgōngzhàngàiduìcèyánjiū
_version_ 1718092470390095872