Manage Recycling and Remanufacturing of Common Components with Sourcing Uncertainty
碩士 === 國立清華大學 === 工業工程與工程管理學系 === 99 === This paper presents a dynamic stochastic optimization model to jointly determine marketing and operations decisions in a remanufacturing system. In the system, two remanufactured products share a common recycled core component. One remanufactured product is...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/41361353945130384161 |
id |
ndltd-TW-099NTHU5031089 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-099NTHU50310892015-10-13T20:23:00Z http://ndltd.ncl.edu.tw/handle/41361353945130384161 Manage Recycling and Remanufacturing of Common Components with Sourcing Uncertainty 回收再製造管理具來源不確定性之共用元件 Chu, Hsiu-Wei 褚修瑋 碩士 國立清華大學 工業工程與工程管理學系 99 This paper presents a dynamic stochastic optimization model to jointly determine marketing and operations decisions in a remanufacturing system. In the system, two remanufactured products share a common recycled core component. One remanufactured product is for the high end market and the other is for the low end market. The company has to decide how many common core components to recycle, how many high end and low end products to remanufacture, and how many high end and low end products to sell in each period given the market conditions. The main source of the uncertainty is the number of the common recycled core component available in each period. The inter-dependence among decision variables and the uncertainty make this problem extremely complicated. Without proper control policies, the company will result in significantly lower profits. Sequential decision processes are used to formulate the problem. The objective is to maximize the sum of total profits over the planning horizon. Efficient value iteration algorithm is developed to solve the problem. The stationary solutions provide relationships between values of decision variables and inventory levels. The impact of the uncertainty is also discussed. Su, Jack. C. P. Wu, Cheng-Hung 蘇哲平 吳政鴻 2011 學位論文 ; thesis 72 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立清華大學 === 工業工程與工程管理學系 === 99 === This paper presents a dynamic stochastic optimization model to jointly determine marketing and operations decisions in a remanufacturing system. In the system, two remanufactured products share a common recycled core component. One remanufactured product is for the high end market and the other is for the low end market. The company has to decide how many common core components to recycle, how many high end and low end products to remanufacture, and how many high end and low end products to sell in each period given the market conditions. The main source of the uncertainty is the number of the common recycled core component available in each period. The inter-dependence among decision variables and the uncertainty make this problem extremely complicated. Without proper control policies, the company will result in significantly lower profits.
Sequential decision processes are used to formulate the problem. The objective is to maximize the sum of total profits over the planning horizon. Efficient value iteration algorithm is developed to solve the problem. The stationary solutions provide relationships between values of decision variables and inventory levels. The impact of the uncertainty is also discussed.
|
author2 |
Su, Jack. C. P. |
author_facet |
Su, Jack. C. P. Chu, Hsiu-Wei 褚修瑋 |
author |
Chu, Hsiu-Wei 褚修瑋 |
spellingShingle |
Chu, Hsiu-Wei 褚修瑋 Manage Recycling and Remanufacturing of Common Components with Sourcing Uncertainty |
author_sort |
Chu, Hsiu-Wei |
title |
Manage Recycling and Remanufacturing of Common Components with Sourcing Uncertainty |
title_short |
Manage Recycling and Remanufacturing of Common Components with Sourcing Uncertainty |
title_full |
Manage Recycling and Remanufacturing of Common Components with Sourcing Uncertainty |
title_fullStr |
Manage Recycling and Remanufacturing of Common Components with Sourcing Uncertainty |
title_full_unstemmed |
Manage Recycling and Remanufacturing of Common Components with Sourcing Uncertainty |
title_sort |
manage recycling and remanufacturing of common components with sourcing uncertainty |
publishDate |
2011 |
url |
http://ndltd.ncl.edu.tw/handle/41361353945130384161 |
work_keys_str_mv |
AT chuhsiuwei managerecyclingandremanufacturingofcommoncomponentswithsourcinguncertainty AT chǔxiūwěi managerecyclingandremanufacturingofcommoncomponentswithsourcinguncertainty AT chuhsiuwei huíshōuzàizhìzàoguǎnlǐjùláiyuánbùquèdìngxìngzhīgòngyòngyuánjiàn AT chǔxiūwěi huíshōuzàizhìzàoguǎnlǐjùláiyuánbùquèdìngxìngzhīgòngyòngyuánjiàn |
_version_ |
1718046644812906496 |