Train Driver Scheduling Problem-case of TRA

碩士 === 國立高雄第一科技大學 === 運籌管理所 === 99 === Abstract Although there are mutual influence between train driver scheduling problem and vehicle scheduling problem, but these problems are usually solved respectively. Driver scheduling problem has been there for a long time. One of the examples include: TRA d...

Full description

Bibliographic Details
Main Authors: Zhi-Wei Hung, 洪志瑋
Other Authors: Shan-Huen Huang
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/31148953573757529745
Description
Summary:碩士 === 國立高雄第一科技大學 === 運籌管理所 === 99 === Abstract Although there are mutual influence between train driver scheduling problem and vehicle scheduling problem, but these problems are usually solved respectively. Driver scheduling problem has been there for a long time. One of the examples include: TRA drivers members, aircraft crew members and transportation drivers. The main consideration for the driver scheduling problem, how to use the limited manpower and cost, make the best scheduling job. Working class generation is the most time-consuming stage in the solving process of driver scheduling problems faced by large transportation companies such as TRA, Kaohsiung MRT and Taipei MRT. The object of this study is "case of TRA", the purpose for the train driver''s scheduling problem. Through genetic algorithms, with the established scheduling constraints, to construct the train driver scheduling the feasible solutions. Objective is minimization of the number of train drivers (ie, the least number of working class), means to find a better work schedule, so the actual number of drivers at least, to build an effective solution. Because this study is a separate study, so the constraints under consideration didn''t complete all of the specifications covering the TRA, but only to take some of the more important restrictions, including: 1. For example, the scope of Kaohsiung TRA, the duties are divided into Tze- Chiang, Fu-Hsing, Chu-Kuang and Local Express, a total of four vehicle type for scheduling. 2. Duty travel time to the day duty-based, which means this time 06:00 ~ 22:00. 3. The train driver scheduling in two modes: to allow drivers to travel across the vehicle types, and are not allowed. 4. Each individual vehicle type into a maximum of K drivers, and doesn''t consider the shift issue. Finally, the work schedules of TRA Kaohsiung-B group (2010) as an example, refer to the same scheduling information, to find a better work schedule, so the actual number of drivers at least. From the results, the number of drivers can be reduced to 23 from 26.