Assessing the Cost Impact of Float Loss on Construction Projects
博士 === 國立高雄第一科技大學 === 工程科技研究所 === 99 === Many techniques have been developed to analyze the loss of time and the costs associated with disruptions of project schedules. However, these techniques generally are limited to considering delays of the critical path and of the overall completion date of t...