碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 99 === Taking considerations of in case of national highway road block occurred from slope sliding due to factors affected by natural disaster or potential changes in geological conditions, how to plan suitability of transported spoil disposal ground for collapsed...

Full description

Bibliographic Details
Main Authors: Yang - Mao, 范揚茂
Other Authors: Shang-Yao Yan
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/33345423518233302694
id ndltd-TW-099NCU05015055
record_format oai_dc
spelling ndltd-TW-099NCU050150552015-10-19T04:03:04Z http://ndltd.ncl.edu.tw/handle/33345423518233302694 The federal highway snatches the disaster machines and tools to assign research of the optimization - take the federal highway 3 3.1k soil slips as an example 國道搶災機具調派最佳化之研究-以國道3號3.1k坍方為例 Yang - Mao 范揚茂 碩士 國立中央大學 土木工程學系碩士在職專班 99 Taking considerations of in case of national highway road block occurred from slope sliding due to factors affected by natural disaster or potential changes in geological conditions, how to plan suitability of transported spoil disposal ground for collapsed earth in disaster site, and consider appropriateness of operations of spoil transport trucks in field working areas to reduce negative impression arising from excessive stand-by vehicles and idle machinery, hoping to reopen the road and resume traffic in shortest time, therefore, this research takes shortened assignment period of spoil transport and dump trucks as scope of study and implement a mathematical optimization model using integral planning as a framework, to assist chief of competent authority to integrate existing spoil grounds, construction equipments and dump trucks, and unifyly plan scheduling and assignment program, hoping to obtain the best and shortest construction du-ration needed for reopening the road. This study model uses integer linear programming as research framework, together with EXCEL spreadsheet tool and LINGO 8.0 software package, to obtain the required solution. The parameters of this model can be timely adjusted according to the conditions required, so as to facilitate the rearrangement of requirement planning program. In addition, it is capable of coping with practical changes and generating required new assignment program through sensitivity analysis of changing trend of relevant parameters.In order to verify the applicability of this model, this research takes National Highway 3 3.1k Hill Sliding Accident as a testing example, after examined the test results and compared with human experience decision-making and assignment model, it reveals that the model functions quite satisfactory. In summary, this study can be flexibly used to meet the integral planning requirements of transported spoil disposal needs for collapsed earth in disaster site, so as to serve as an important reference to help disaster relief department in developing and preparing scheduling and assignment programs Shang-Yao Yan 顏上 2011 學位論文 ; thesis 89 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 99 === Taking considerations of in case of national highway road block occurred from slope sliding due to factors affected by natural disaster or potential changes in geological conditions, how to plan suitability of transported spoil disposal ground for collapsed earth in disaster site, and consider appropriateness of operations of spoil transport trucks in field working areas to reduce negative impression arising from excessive stand-by vehicles and idle machinery, hoping to reopen the road and resume traffic in shortest time, therefore, this research takes shortened assignment period of spoil transport and dump trucks as scope of study and implement a mathematical optimization model using integral planning as a framework, to assist chief of competent authority to integrate existing spoil grounds, construction equipments and dump trucks, and unifyly plan scheduling and assignment program, hoping to obtain the best and shortest construction du-ration needed for reopening the road. This study model uses integer linear programming as research framework, together with EXCEL spreadsheet tool and LINGO 8.0 software package, to obtain the required solution. The parameters of this model can be timely adjusted according to the conditions required, so as to facilitate the rearrangement of requirement planning program. In addition, it is capable of coping with practical changes and generating required new assignment program through sensitivity analysis of changing trend of relevant parameters.In order to verify the applicability of this model, this research takes National Highway 3 3.1k Hill Sliding Accident as a testing example, after examined the test results and compared with human experience decision-making and assignment model, it reveals that the model functions quite satisfactory. In summary, this study can be flexibly used to meet the integral planning requirements of transported spoil disposal needs for collapsed earth in disaster site, so as to serve as an important reference to help disaster relief department in developing and preparing scheduling and assignment programs
author2 Shang-Yao Yan
author_facet Shang-Yao Yan
Yang - Mao
范揚茂
author Yang - Mao
范揚茂
spellingShingle Yang - Mao
范揚茂
The federal highway snatches the disaster machines and tools to assign research of the optimization - take the federal highway 3 3.1k soil slips as an example
author_sort Yang - Mao
title The federal highway snatches the disaster machines and tools to assign research of the optimization - take the federal highway 3 3.1k soil slips as an example
title_short The federal highway snatches the disaster machines and tools to assign research of the optimization - take the federal highway 3 3.1k soil slips as an example
title_full The federal highway snatches the disaster machines and tools to assign research of the optimization - take the federal highway 3 3.1k soil slips as an example
title_fullStr The federal highway snatches the disaster machines and tools to assign research of the optimization - take the federal highway 3 3.1k soil slips as an example
title_full_unstemmed The federal highway snatches the disaster machines and tools to assign research of the optimization - take the federal highway 3 3.1k soil slips as an example
title_sort federal highway snatches the disaster machines and tools to assign research of the optimization - take the federal highway 3 3.1k soil slips as an example
publishDate 2011
url http://ndltd.ncl.edu.tw/handle/33345423518233302694
work_keys_str_mv AT yangmao thefederalhighwaysnatchesthedisastermachinesandtoolstoassignresearchoftheoptimizationtakethefederalhighway331ksoilslipsasanexample
AT fànyángmào thefederalhighwaysnatchesthedisastermachinesandtoolstoassignresearchoftheoptimizationtakethefederalhighway331ksoilslipsasanexample
AT yangmao guódàoqiǎngzāijījùdiàopàizuìjiāhuàzhīyánjiūyǐguódào3hào31ktānfāngwèilì
AT fànyángmào guódàoqiǎngzāijījùdiàopàizuìjiāhuàzhīyánjiūyǐguódào3hào31ktānfāngwèilì
AT yangmao federalhighwaysnatchesthedisastermachinesandtoolstoassignresearchoftheoptimizationtakethefederalhighway331ksoilslipsasanexample
AT fànyángmào federalhighwaysnatchesthedisastermachinesandtoolstoassignresearchoftheoptimizationtakethefederalhighway331ksoilslipsasanexample
_version_ 1718093066028449792