A Study of Using TOC Demand-Pull & Buffer Management to Enhance the Order Fulfillment
碩士 === 國立交通大學 === 管理學院工業工程與管理學程 === 99 === Consumer electronic product is affected by boom fluctuation very huge in current environment. Beside, the inventory level depends upon the accuracy of forecast in traditional inventory control and supply chain management - such kind of management thinking b...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/36220168084396495222 |
Summary: | 碩士 === 國立交通大學 === 管理學院工業工程與管理學程 === 99 === Consumer electronic product is affected by boom fluctuation very huge in current environment. Beside, the inventory level depends upon the accuracy of forecast in traditional inventory control and supply chain management - such kind of management thinking brings high inventory stock in whole supply chain but low fulfillment and service level to the downstream customer. To overcome the predicament, will use the concept of 「Demand-Pull」and 「Buffer-Management」in Theory of Constraint (TOC) to verify the feasibility against “L” brand headset product.
The historical data ranges from Jun’08 to Dec’08 and the simulation of 「Demand-Pull」and 「Buffer-Management」will be the control group comparing with four performance indexes in current operation mode.
|
---|