The Construction of Master Production Scheduling Planning System for Ingot-Wafer Process in Solar Energy Factory

碩士 === 國立交通大學 === 工業工程與管理學系 === 99 === The manufacturing of ingot-wafer process in solar energy factory includes two bottlenecks, named crystal-growing workstation and wafer-slicing workstation, which belongs to make-to-stock and make-to-order. The process time and setup time on crystal-growing work...

Full description

Bibliographic Details
Main Authors: Huang, Po-Hsiang, 黃博祥
Other Authors: Chung, Shu-Hsing
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/70927944121395284348
id ndltd-TW-099NCTU5031097
record_format oai_dc
spelling ndltd-TW-099NCTU50310972015-10-13T20:37:26Z http://ndltd.ncl.edu.tw/handle/70927944121395284348 The Construction of Master Production Scheduling Planning System for Ingot-Wafer Process in Solar Energy Factory 太陽能廠晶錠-晶圓製程主生產排程規劃系統之構建 Huang, Po-Hsiang 黃博祥 碩士 國立交通大學 工業工程與管理學系 99 The manufacturing of ingot-wafer process in solar energy factory includes two bottlenecks, named crystal-growing workstation and wafer-slicing workstation, which belongs to make-to-stock and make-to-order. The process time and setup time on crystal-growing workstation are very long. The wafer-slicing workstation owns multiple-type machines which are in batch processing. For each macine in each machine type, the process time and throughput rate for an order is different. To be an effective manufacturing system and to improve competitiveness, the solar energy factory needs to make production plan properly for each period appropriately so as to satisfy the demand of orders. Thus, this thesis develops a master production scheduling (MPS) system for the solar energy factory for the manufacturing environment. The MPS system includes rough cut capacity planning module and bottleneck scheduling module. The rough cut capacity planning module is used to calculate the capacity supply of each bottleneck workstation and the time needed by all orders. Based on the result of rough cut capacity planning, the bottleneck scheduling module constructs the integer programming model for the wafer-slicing workstation, which considers the machines load, setup time, quantity of each order, release time and due date, to generate the production schedule on each machine and the production amount for each order, with minimizing number of tardy orders as the objective. According to the result of cases analysis, this system can attain optimal solution. Furthermore, by planning multi-planning periods in a horizon simultaneously, it can reduce the number of setup times and the setup time between periods. In addition, the thesis also proposes another scheduling system which pursue earlier period can produce as far as possible enables later period to have surplus produces energy for urgent orders of customers. Hence, the production scheduling system proposed in this thesis can allocate the best production quantity of each order on each machine in each planning period in effectively time. Chung, Shu-Hsing Pearn, Wen-Lea 鍾淑馨 彭文理 2011 學位論文 ; thesis 130 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 工業工程與管理學系 === 99 === The manufacturing of ingot-wafer process in solar energy factory includes two bottlenecks, named crystal-growing workstation and wafer-slicing workstation, which belongs to make-to-stock and make-to-order. The process time and setup time on crystal-growing workstation are very long. The wafer-slicing workstation owns multiple-type machines which are in batch processing. For each macine in each machine type, the process time and throughput rate for an order is different. To be an effective manufacturing system and to improve competitiveness, the solar energy factory needs to make production plan properly for each period appropriately so as to satisfy the demand of orders. Thus, this thesis develops a master production scheduling (MPS) system for the solar energy factory for the manufacturing environment. The MPS system includes rough cut capacity planning module and bottleneck scheduling module. The rough cut capacity planning module is used to calculate the capacity supply of each bottleneck workstation and the time needed by all orders. Based on the result of rough cut capacity planning, the bottleneck scheduling module constructs the integer programming model for the wafer-slicing workstation, which considers the machines load, setup time, quantity of each order, release time and due date, to generate the production schedule on each machine and the production amount for each order, with minimizing number of tardy orders as the objective. According to the result of cases analysis, this system can attain optimal solution. Furthermore, by planning multi-planning periods in a horizon simultaneously, it can reduce the number of setup times and the setup time between periods. In addition, the thesis also proposes another scheduling system which pursue earlier period can produce as far as possible enables later period to have surplus produces energy for urgent orders of customers. Hence, the production scheduling system proposed in this thesis can allocate the best production quantity of each order on each machine in each planning period in effectively time.
author2 Chung, Shu-Hsing
author_facet Chung, Shu-Hsing
Huang, Po-Hsiang
黃博祥
author Huang, Po-Hsiang
黃博祥
spellingShingle Huang, Po-Hsiang
黃博祥
The Construction of Master Production Scheduling Planning System for Ingot-Wafer Process in Solar Energy Factory
author_sort Huang, Po-Hsiang
title The Construction of Master Production Scheduling Planning System for Ingot-Wafer Process in Solar Energy Factory
title_short The Construction of Master Production Scheduling Planning System for Ingot-Wafer Process in Solar Energy Factory
title_full The Construction of Master Production Scheduling Planning System for Ingot-Wafer Process in Solar Energy Factory
title_fullStr The Construction of Master Production Scheduling Planning System for Ingot-Wafer Process in Solar Energy Factory
title_full_unstemmed The Construction of Master Production Scheduling Planning System for Ingot-Wafer Process in Solar Energy Factory
title_sort construction of master production scheduling planning system for ingot-wafer process in solar energy factory
publishDate 2011
url http://ndltd.ncl.edu.tw/handle/70927944121395284348
work_keys_str_mv AT huangpohsiang theconstructionofmasterproductionschedulingplanningsystemforingotwaferprocessinsolarenergyfactory
AT huángbóxiáng theconstructionofmasterproductionschedulingplanningsystemforingotwaferprocessinsolarenergyfactory
AT huangpohsiang tàiyángnéngchǎngjīngdìngjīngyuánzhìchéngzhǔshēngchǎnpáichéngguīhuàxìtǒngzhīgòujiàn
AT huángbóxiáng tàiyángnéngchǎngjīngdìngjīngyuánzhìchéngzhǔshēngchǎnpáichéngguīhuàxìtǒngzhīgòujiàn
AT huangpohsiang constructionofmasterproductionschedulingplanningsystemforingotwaferprocessinsolarenergyfactory
AT huángbóxiáng constructionofmasterproductionschedulingplanningsystemforingotwaferprocessinsolarenergyfactory
_version_ 1718049344651788288