A Study on the Agent Based Project Dynamic Scheduling Problem
碩士 === 龍華科技大學 === 資訊管理研究所 === 99 === The progress of a project always encounters highly uncertainty environment. The schedule of the project must be adjusted dynamically and adaptively over time, and the related resources must be rearranged effectively in accordance with the change of the schedule,...
Main Authors: | Chung-Han Shen, 沈忠翰 |
---|---|
Other Authors: | Chi-Ming Chou |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/75412918775408682940 |
Similar Items
-
A multi-agent-based system for two-stage scheduling problem of offshore project
by: Duanfeng Han, et al.
Published: (2017-10-01) -
A study of multitasking scheduling problem with two agents on a single-machine environment
by: SHEN,WEI-LUN, et al.
Published: (2019) -
Dynamic search control-based particle swarm optimization for project scheduling problems
by: Ruey-Maw Chen, et al.
Published: (2016-04-01) -
The Study of Particle Swarm Optimization for The Multi-Mode Resource-Constrained Project Scheduling Problem
by: Chung-Lun Wu, et al.
Published: (2009) -
Agent-based heuristics for large, multiple-mode, resource-constrained project scheduling problems
by: Knotts, Gary Wayne, 1962-
Published: (1998)