The Research of Public Project Bidding Price Prediction through Batch-Form Least Squares Estimate
碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 99 === This research collects tendering data for a total of 1,673 construction projects from Ccentral Government, Kaohsiung City and Taitung County. The final bidding price for construction is designated as the dependent variable and another 5 factors of budget...
Main Authors: | jau-neng hung, 洪兆能 |
---|---|
Other Authors: | Yu-Ren Wang |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/08803445307997512656 |
Similar Items
-
The Least-Squares Method for American Option Pricing
by: Huang, Xuejun, et al.
Published: (2009) -
The Quality Prediction in Small-batch Producing Based on Weighted Least Squares Support Vector Regression
by: Zhang Sheng Bo, et al.
Published: (2016-01-01) -
Properties of the total least squares estimation
by: Wang Leyang
Published: (2012-11-01) -
Least Square Estimation for Monotone Regression
by: Hsin-Yi Cheng, et al.
Published: (2009) -
Least squares mixture decomposition estimation
by: Kim, Donggeon
Published: (2014)