The Research of Public Project Bidding Price Prediction through Batch-Form Least Squares Estimate

碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 99 === This research collects tendering data for a total of 1,673 construction projects from Ccentral Government, Kaohsiung City and Taitung County. The final bidding price for construction is designated as the dependent variable and another 5 factors of budget...

Full description

Bibliographic Details
Main Authors: jau-neng hung, 洪兆能
Other Authors: Yu-Ren Wang
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/08803445307997512656
id ndltd-TW-099KUAS8653058
record_format oai_dc
spelling ndltd-TW-099KUAS86530582015-10-16T04:02:47Z http://ndltd.ncl.edu.tw/handle/08803445307997512656 The Research of Public Project Bidding Price Prediction through Batch-Form Least Squares Estimate 以整批式最小平方估測模式預測公共工程標價之研究 jau-neng hung 洪兆能 碩士 國立高雄應用科技大學 土木工程與防災科技研究所 99 This research collects tendering data for a total of 1,673 construction projects from Ccentral Government, Kaohsiung City and Taitung County. The final bidding price for construction is designated as the dependent variable and another 5 factors of budget amount, bidding bond, base price, number of bids and performance period are assigned as the independent variables. Pearson's Correlation Coefficient Analysis and the Whole Batch Least Squares Estimation Method are used to examine the relationships between each dependent variable and independent variables. Afterwards, the most highly associated independent variables are feed into the Whole Batch Least Squares Estimation Method as the prediction model inputs. The Pearson Correlation Coefficient and the Whole Batch Least Squares Estimation Method analysis results show that three out of the five factors are highly associated with the final bidding price. These three factors are: Basic Price、Budget Amount and Bidding Bond. As a result, these three factors are used to predict the Final Bidding Price for this research. The analysis results show that when the power of LSE model is higher, the variance obtained is smaller, and thus make the estimation results more accurate. However, for projects with smaller final bidding price, the prediction errors are larger. Through multiple regression analysis, it is found that the related error variance (prediction accuracy) is lower for the quadratic non-linear Whole Batch Least Squares Estimation. The research results have shown that Pearson Correlation Coefficient analysis is efficient in selecting crucial factors influencing final bidding price for the prediction model. When projects are divided into several groups according to their total cost, the Whole Batch Least Squares Estimation model is able to produce satisfactory prediction results. This provides valuable information to government officials when assessing the legitimacy of the actual bidding price. In the mean time, the contractors are able to use the model with only two inputs, Budget Amount, and Bidding Bond to generate moderate prediction results for their reference when making the final decition before tendering. Yu-Ren Wang 王裕仁 2011 學位論文 ; thesis 84 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 99 === This research collects tendering data for a total of 1,673 construction projects from Ccentral Government, Kaohsiung City and Taitung County. The final bidding price for construction is designated as the dependent variable and another 5 factors of budget amount, bidding bond, base price, number of bids and performance period are assigned as the independent variables. Pearson's Correlation Coefficient Analysis and the Whole Batch Least Squares Estimation Method are used to examine the relationships between each dependent variable and independent variables. Afterwards, the most highly associated independent variables are feed into the Whole Batch Least Squares Estimation Method as the prediction model inputs. The Pearson Correlation Coefficient and the Whole Batch Least Squares Estimation Method analysis results show that three out of the five factors are highly associated with the final bidding price. These three factors are: Basic Price、Budget Amount and Bidding Bond. As a result, these three factors are used to predict the Final Bidding Price for this research. The analysis results show that when the power of LSE model is higher, the variance obtained is smaller, and thus make the estimation results more accurate. However, for projects with smaller final bidding price, the prediction errors are larger. Through multiple regression analysis, it is found that the related error variance (prediction accuracy) is lower for the quadratic non-linear Whole Batch Least Squares Estimation. The research results have shown that Pearson Correlation Coefficient analysis is efficient in selecting crucial factors influencing final bidding price for the prediction model. When projects are divided into several groups according to their total cost, the Whole Batch Least Squares Estimation model is able to produce satisfactory prediction results. This provides valuable information to government officials when assessing the legitimacy of the actual bidding price. In the mean time, the contractors are able to use the model with only two inputs, Budget Amount, and Bidding Bond to generate moderate prediction results for their reference when making the final decition before tendering.
author2 Yu-Ren Wang
author_facet Yu-Ren Wang
jau-neng hung
洪兆能
author jau-neng hung
洪兆能
spellingShingle jau-neng hung
洪兆能
The Research of Public Project Bidding Price Prediction through Batch-Form Least Squares Estimate
author_sort jau-neng hung
title The Research of Public Project Bidding Price Prediction through Batch-Form Least Squares Estimate
title_short The Research of Public Project Bidding Price Prediction through Batch-Form Least Squares Estimate
title_full The Research of Public Project Bidding Price Prediction through Batch-Form Least Squares Estimate
title_fullStr The Research of Public Project Bidding Price Prediction through Batch-Form Least Squares Estimate
title_full_unstemmed The Research of Public Project Bidding Price Prediction through Batch-Form Least Squares Estimate
title_sort research of public project bidding price prediction through batch-form least squares estimate
publishDate 2011
url http://ndltd.ncl.edu.tw/handle/08803445307997512656
work_keys_str_mv AT jaunenghung theresearchofpublicprojectbiddingpricepredictionthroughbatchformleastsquaresestimate
AT hóngzhàonéng theresearchofpublicprojectbiddingpricepredictionthroughbatchformleastsquaresestimate
AT jaunenghung yǐzhěngpīshìzuìxiǎopíngfānggūcèmóshìyùcègōnggònggōngchéngbiāojiàzhīyánjiū
AT hóngzhàonéng yǐzhěngpīshìzuìxiǎopíngfānggūcèmóshìyùcègōnggònggōngchéngbiāojiàzhīyánjiū
AT jaunenghung researchofpublicprojectbiddingpricepredictionthroughbatchformleastsquaresestimate
AT hóngzhàonéng researchofpublicprojectbiddingpricepredictionthroughbatchformleastsquaresestimate
_version_ 1718090711293755392