Validation of the crew of 800-mm sanitary sewer by productivity model--using Nanzih and Fengshan districts of Kaohsiung as an example

碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 99 === In recent years, although many researchers have studied on the investigation of the crew of construction rate based on Thomas’s productivity theory and multiple regression models, few study was carried on the verification and modification of crew-schedul...

Full description

Bibliographic Details
Main Authors: Chien-Hung Chou, 周建宏
Other Authors: Tzong-Tzeng Lin
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/38314698229437304236
id ndltd-TW-099KUAS8653046
record_format oai_dc
spelling ndltd-TW-099KUAS86530462015-10-16T04:02:47Z http://ndltd.ncl.edu.tw/handle/38314698229437304236 Validation of the crew of 800-mm sanitary sewer by productivity model--using Nanzih and Fengshan districts of Kaohsiung as an example ∮800mm污水管線推進工班生產力模式驗證-以高雄市楠梓區與高雄縣鳳山市為案例分析 Chien-Hung Chou 周建宏 碩士 國立高雄應用科技大學 土木工程與防災科技研究所 99 In recent years, although many researchers have studied on the investigation of the crew of construction rate based on Thomas’s productivity theory and multiple regression models, few study was carried on the verification and modification of crew-scheduling productivity model under different geological condition. Thus, this study estimates the difference between model-predicted productivity and actual productivity (using Nanzih and Fengshan districts of Kaohsiung city as the actual cases). This research used the crew of a 700-mm jacking pipe as a model-predicted productivity (7.57 wh/m) to predict the productivity of case A and case B (800-mm jacking pipe). The results indicated that the both of model-predicted productivities are higher than the actual productivity. Then, we calculate the ratio of optimal productivity and model-predicted productivity (0.4465 and 0.2867, respectively). By the comparison of construction conditions, it shows that the overestimation influencing factor could be related to the deeper groundwater level and the better geological condition. Tzong-Tzeng Lin 林宗曾 2011 學位論文 ; thesis 44 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 99 === In recent years, although many researchers have studied on the investigation of the crew of construction rate based on Thomas’s productivity theory and multiple regression models, few study was carried on the verification and modification of crew-scheduling productivity model under different geological condition. Thus, this study estimates the difference between model-predicted productivity and actual productivity (using Nanzih and Fengshan districts of Kaohsiung city as the actual cases). This research used the crew of a 700-mm jacking pipe as a model-predicted productivity (7.57 wh/m) to predict the productivity of case A and case B (800-mm jacking pipe). The results indicated that the both of model-predicted productivities are higher than the actual productivity. Then, we calculate the ratio of optimal productivity and model-predicted productivity (0.4465 and 0.2867, respectively). By the comparison of construction conditions, it shows that the overestimation influencing factor could be related to the deeper groundwater level and the better geological condition.
author2 Tzong-Tzeng Lin
author_facet Tzong-Tzeng Lin
Chien-Hung Chou
周建宏
author Chien-Hung Chou
周建宏
spellingShingle Chien-Hung Chou
周建宏
Validation of the crew of 800-mm sanitary sewer by productivity model--using Nanzih and Fengshan districts of Kaohsiung as an example
author_sort Chien-Hung Chou
title Validation of the crew of 800-mm sanitary sewer by productivity model--using Nanzih and Fengshan districts of Kaohsiung as an example
title_short Validation of the crew of 800-mm sanitary sewer by productivity model--using Nanzih and Fengshan districts of Kaohsiung as an example
title_full Validation of the crew of 800-mm sanitary sewer by productivity model--using Nanzih and Fengshan districts of Kaohsiung as an example
title_fullStr Validation of the crew of 800-mm sanitary sewer by productivity model--using Nanzih and Fengshan districts of Kaohsiung as an example
title_full_unstemmed Validation of the crew of 800-mm sanitary sewer by productivity model--using Nanzih and Fengshan districts of Kaohsiung as an example
title_sort validation of the crew of 800-mm sanitary sewer by productivity model--using nanzih and fengshan districts of kaohsiung as an example
publishDate 2011
url http://ndltd.ncl.edu.tw/handle/38314698229437304236
work_keys_str_mv AT chienhungchou validationofthecrewof800mmsanitarysewerbyproductivitymodelusingnanzihandfengshandistrictsofkaohsiungasanexample
AT zhōujiànhóng validationofthecrewof800mmsanitarysewerbyproductivitymodelusingnanzihandfengshandistrictsofkaohsiungasanexample
AT chienhungchou 800mmwūshuǐguǎnxiàntuījìngōngbānshēngchǎnlìmóshìyànzhèngyǐgāoxióngshìnánzǐqūyǔgāoxióngxiànfèngshānshìwèiànlìfēnxī
AT zhōujiànhóng 800mmwūshuǐguǎnxiàntuījìngōngbānshēngchǎnlìmóshìyànzhèngyǐgāoxióngshìnánzǐqūyǔgāoxióngxiànfèngshānshìwèiànlìfēnxī
_version_ 1718090706840453120