Application of AHP in the Subcontract Planning - A Case Study of the Electrical and Mechanical Engineering

碩士 === 國立高雄應用科技大學 === 工業工程與管理系 === 99 === Division of labor is a trend and has a significant role in the effects of manufacturing industry for a long time. With the growth of national economic and the amazing architecture around the world, more and more enormous and complex projects are now presente...

Full description

Bibliographic Details
Main Authors: Jui-Hung Chuang, 莊睿紘
Other Authors: Shan-Yau Wu
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/85313590011532743659
id ndltd-TW-099KUAS8041057
record_format oai_dc
spelling ndltd-TW-099KUAS80410572015-10-16T04:02:39Z http://ndltd.ncl.edu.tw/handle/85313590011532743659 Application of AHP in the Subcontract Planning - A Case Study of the Electrical and Mechanical Engineering 應用層級分析法於工程分包規劃—以機電工程分包為例 Jui-Hung Chuang 莊睿紘 碩士 國立高雄應用科技大學 工業工程與管理系 99 Division of labor is a trend and has a significant role in the effects of manufacturing industry for a long time. With the growth of national economic and the amazing architecture around the world, more and more enormous and complex projects are now presented and created worldwide. Mechanical and electrical engineering plays as a key factor in the controlling of entirety building. In this study, Analytic Hierarchy Process is utilized to devise and analysis a survey on the basis of the important layers and elements. The results can be established by an efficient system of subcontract planning model, and improve the decision performance of subcontract planning of mechanical and electrical engineering in Taiwan. Shan-Yau Wu 吳杉堯 2011 學位論文 ; thesis 113 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄應用科技大學 === 工業工程與管理系 === 99 === Division of labor is a trend and has a significant role in the effects of manufacturing industry for a long time. With the growth of national economic and the amazing architecture around the world, more and more enormous and complex projects are now presented and created worldwide. Mechanical and electrical engineering plays as a key factor in the controlling of entirety building. In this study, Analytic Hierarchy Process is utilized to devise and analysis a survey on the basis of the important layers and elements. The results can be established by an efficient system of subcontract planning model, and improve the decision performance of subcontract planning of mechanical and electrical engineering in Taiwan.
author2 Shan-Yau Wu
author_facet Shan-Yau Wu
Jui-Hung Chuang
莊睿紘
author Jui-Hung Chuang
莊睿紘
spellingShingle Jui-Hung Chuang
莊睿紘
Application of AHP in the Subcontract Planning - A Case Study of the Electrical and Mechanical Engineering
author_sort Jui-Hung Chuang
title Application of AHP in the Subcontract Planning - A Case Study of the Electrical and Mechanical Engineering
title_short Application of AHP in the Subcontract Planning - A Case Study of the Electrical and Mechanical Engineering
title_full Application of AHP in the Subcontract Planning - A Case Study of the Electrical and Mechanical Engineering
title_fullStr Application of AHP in the Subcontract Planning - A Case Study of the Electrical and Mechanical Engineering
title_full_unstemmed Application of AHP in the Subcontract Planning - A Case Study of the Electrical and Mechanical Engineering
title_sort application of ahp in the subcontract planning - a case study of the electrical and mechanical engineering
publishDate 2011
url http://ndltd.ncl.edu.tw/handle/85313590011532743659
work_keys_str_mv AT juihungchuang applicationofahpinthesubcontractplanningacasestudyoftheelectricalandmechanicalengineering
AT zhuāngruìhóng applicationofahpinthesubcontractplanningacasestudyoftheelectricalandmechanicalengineering
AT juihungchuang yīngyòngcéngjífēnxīfǎyúgōngchéngfēnbāoguīhuàyǐjīdiàngōngchéngfēnbāowèilì
AT zhuāngruìhóng yīngyòngcéngjífēnxīfǎyúgōngchéngfēnbāoguīhuàyǐjīdiàngōngchéngfēnbāowèilì
_version_ 1718090514478137344