The Application of Failure Mode and Effect Analysis (FMEA) To Project Procurement Management-Example of a Public Affairs.

碩士 === 開南大學 === 資訊學院碩士在職專班 === 99 === Failure Mode and Effects Analysis (FMEA) is used as a reliability evaluation technique to determine the effects of system and equipment failures for many industries. It can help engineers to find defects of a product in design or manufacturing processes and take...

Full description

Bibliographic Details
Main Authors: HSIEH MING-HSI, 謝明熹
Other Authors: SHEU JIANN HWA
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/40212798684212482898
id ndltd-TW-099KNU00392011
record_format oai_dc
spelling ndltd-TW-099KNU003920112015-10-13T21:33:09Z http://ndltd.ncl.edu.tw/handle/40212798684212482898 The Application of Failure Mode and Effect Analysis (FMEA) To Project Procurement Management-Example of a Public Affairs. 運用失效模式與效應分析探討專案採購管理-以公務機關為例 HSIEH MING-HSI 謝明熹 碩士 開南大學 資訊學院碩士在職專班 99 Failure Mode and Effects Analysis (FMEA) is used as a reliability evaluation technique to determine the effects of system and equipment failures for many industries. It can help engineers to find defects of a product in design or manufacturing processes and take some corrective actions to eliminate or prevent the failures. Most of the current FMEA uses the Risk Priority Number (RPN) to evaluate the risk of failure. However, several shortcomings in the RPN calculation and its interpretation have been found in the literature. This research primarily in the study and construction of a complete set of procedures for procuring FMEA, To practical use in the public sector procurement of job, and attempt to use fuzzy theory FMEA risk priority assessment, and the assessment criteria of the sort, in order to establish criteria for the relevance of this study, so the results more objective. Finally, a research project failure mode of procurement operations to verify that the proposed method, And the application of FMEA range from product design or process improvements extend to project procurement management, so that project managers can purchase the entire project before the implementation cycle, early preventive measures to establish. SHEU JIANN HWA SHEU RONG LONG 許建華 許榮隆 2011 學位論文 ; thesis 148 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 開南大學 === 資訊學院碩士在職專班 === 99 === Failure Mode and Effects Analysis (FMEA) is used as a reliability evaluation technique to determine the effects of system and equipment failures for many industries. It can help engineers to find defects of a product in design or manufacturing processes and take some corrective actions to eliminate or prevent the failures. Most of the current FMEA uses the Risk Priority Number (RPN) to evaluate the risk of failure. However, several shortcomings in the RPN calculation and its interpretation have been found in the literature. This research primarily in the study and construction of a complete set of procedures for procuring FMEA, To practical use in the public sector procurement of job, and attempt to use fuzzy theory FMEA risk priority assessment, and the assessment criteria of the sort, in order to establish criteria for the relevance of this study, so the results more objective. Finally, a research project failure mode of procurement operations to verify that the proposed method, And the application of FMEA range from product design or process improvements extend to project procurement management, so that project managers can purchase the entire project before the implementation cycle, early preventive measures to establish.
author2 SHEU JIANN HWA
author_facet SHEU JIANN HWA
HSIEH MING-HSI
謝明熹
author HSIEH MING-HSI
謝明熹
spellingShingle HSIEH MING-HSI
謝明熹
The Application of Failure Mode and Effect Analysis (FMEA) To Project Procurement Management-Example of a Public Affairs.
author_sort HSIEH MING-HSI
title The Application of Failure Mode and Effect Analysis (FMEA) To Project Procurement Management-Example of a Public Affairs.
title_short The Application of Failure Mode and Effect Analysis (FMEA) To Project Procurement Management-Example of a Public Affairs.
title_full The Application of Failure Mode and Effect Analysis (FMEA) To Project Procurement Management-Example of a Public Affairs.
title_fullStr The Application of Failure Mode and Effect Analysis (FMEA) To Project Procurement Management-Example of a Public Affairs.
title_full_unstemmed The Application of Failure Mode and Effect Analysis (FMEA) To Project Procurement Management-Example of a Public Affairs.
title_sort application of failure mode and effect analysis (fmea) to project procurement management-example of a public affairs.
publishDate 2011
url http://ndltd.ncl.edu.tw/handle/40212798684212482898
work_keys_str_mv AT hsiehminghsi theapplicationoffailuremodeandeffectanalysisfmeatoprojectprocurementmanagementexampleofapublicaffairs
AT xièmíngxī theapplicationoffailuremodeandeffectanalysisfmeatoprojectprocurementmanagementexampleofapublicaffairs
AT hsiehminghsi yùnyòngshīxiàomóshìyǔxiàoyīngfēnxītàntǎozhuānàncǎigòuguǎnlǐyǐgōngwùjīguānwèilì
AT xièmíngxī yùnyòngshīxiàomóshìyǔxiàoyīngfēnxītàntǎozhuānàncǎigòuguǎnlǐyǐgōngwùjīguānwèilì
AT hsiehminghsi applicationoffailuremodeandeffectanalysisfmeatoprojectprocurementmanagementexampleofapublicaffairs
AT xièmíngxī applicationoffailuremodeandeffectanalysisfmeatoprojectprocurementmanagementexampleofapublicaffairs
_version_ 1718065827649945600