The Studies of applying Teamcenter in Engineering Design Change process management

碩士 === 逢甲大學 === 材料與製造工程所 === 99 === Advances in technology, many products because the demand created by, and enterprises in order to fast the product produced, the concept of a product from start to finish manufacturing, in addition to the large number of people to design and manufacture of, if all...

Full description

Bibliographic Details
Main Authors: Chi-Hua Lian, 連啟華
Other Authors: none
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/58044625016458334814
Description
Summary:碩士 === 逢甲大學 === 材料與製造工程所 === 99 === Advances in technology, many products because the demand created by, and enterprises in order to fast the product produced, the concept of a product from start to finish manufacturing, in addition to the large number of people to design and manufacture of, if all production processes are design and manufacturing process in accordance with the procedures, the enterprise can be completed within the required time frame, but occurred at any step of the project change, regardless of the reasons held by engineering change, as this will result in time delays. Many companies have begun to attach importance to the importance of engineering change management, how effective management of engineering change documents and generated when the image file, and make communication between departments, and to complete and effective process for integration of all engineering change documents produced by the process, all changes in the project information to be generated properly kept, are the emphasis on engineering change of each enterprise, need attention and face. In recent years, sales of smart phones and more widely, and its higher price, manufacturers for the sake of light, thin and high-quality, all components and the back cover, including extensive use of sheet metal design, this study for SMEs orders, the sheet metal stamping dies in engineering change processes arising from the inter-departmental transfer graphics information and the time required for the process to be explored in order to build Teamcenter as a platform for knowledge management systems, combined with Oracle as the database system the use of engineering change the case of verification of their systems, understand the engineering change into the PDM system for its ease of applicability, and finally to expert interviews to get their systems in engineering change processes, the time required for inter-departmental liaison significantly reduce , document creation, although some common computer-written, but in data collection and search on the Teamcenter has its benefit. Hope the results will increase it value to provide a business reference.