Determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system with all defective items scrapped.
碩士 === 朝陽科技大學 === 工業工程與管理系碩士班 === 99 === This paper determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system. with all defective items scrapped. The economic production quantity (EPQ) assumed a continuous distribution , Inventory Management Progra...
Main Authors: | Yung-chung Chen, 陳永忠 |
---|---|
Other Authors: | Yuan-shyi Peter Chiu |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/32209098455697102746 |
Similar Items
-
Determining common cycle and (n+1) deliveries for a multi-item system with scrap, and the optimal run time for single-vendor-single-buyer integrated system with machine breakdowns, multi-delivery policy and scrap.
by: Hsin-Mei Chen, et al.
Published: (2014) -
Determining the optimal production-shipment policies for single-vendor-multiple-buyers integrated system with failure in rework and (n+1) deliveries, and for a multi-item production system with scrap and multi-delivery policy
by: Chao-Chih Huang, et al.
Published: (2011) -
Determining the optimal lot size and shipments for EPQmodel with (n+1) deliveries policy and single-vendor multi-buyer in a supply chain environment with partial reworkable defective items
by: Li-wen Lin, et al.
Published: (2010) -
A Single-vendor and multi-buyer integrated inventory model for deteriorating items with exogenous cost
by: Yan-Ying Zou, et al.
Published: (2016) -
A decision support system for an integrated vendor-buyer system with reworking defective items
by: Chen-San Cheng, et al.
Published: (2016)