Determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system with all defective items scrapped.
碩士 === 朝陽科技大學 === 工業工程與管理系碩士班 === 99 === This paper determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system. with all defective items scrapped. The economic production quantity (EPQ) assumed a continuous distribution , Inventory Management Progra...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/32209098455697102746 |
id |
ndltd-TW-099CYUT5031016 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-099CYUT50310162015-10-13T20:22:51Z http://ndltd.ncl.edu.tw/handle/32209098455697102746 Determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system with all defective items scrapped. 探討(n+1)次配送給多個顧客對不良品全部報廢之生產系統的生產批量與配送次數之最佳決策 Yung-chung Chen 陳永忠 碩士 朝陽科技大學 工業工程與管理系碩士班 99 This paper determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system. with all defective items scrapped. The economic production quantity (EPQ) assumed a continuous distribution , Inventory Management Program and the general case, are a perfect production or distribution of such single situation, and so this situation with great differences in the industry, The actual production will produce bad products, and distribution, not all the way to full production after the completion of a distribution. Therefore , this study is in line with the actual situation, of sub-sub-distribution model, expected the optimal lot size and shipments, to make annual inventory costs are minimized. The study of distribution methods, manufacturers at the time of production, the first for a delivery to meet customer demand at the time, then a quantitative way up to n times and distribution customers. Including manufacturers and customers of inventory holding costs for the construction of mathematical models to consider, and to derive the expected total inventory costs are minimized in the case, obtain the optimal lot size and shipments, exemplify the analysis , hope that this study will respond to the actual situation, providing the industry distribution of decision-making basis for reference. Yuan-shyi Peter Chiu 邱元錫 2011 學位論文 ; thesis 55 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 朝陽科技大學 === 工業工程與管理系碩士班 === 99 === This paper determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system. with all defective items scrapped. The economic production quantity (EPQ) assumed a continuous distribution , Inventory Management Program and the general case, are a perfect production or distribution of such single situation, and so this situation with great differences in the industry, The actual production will produce bad products, and distribution, not all the way to full production after the completion of a distribution. Therefore , this study is in line with the actual situation, of sub-sub-distribution model, expected the optimal lot size and shipments, to make annual inventory costs are minimized.
The study of distribution methods, manufacturers at the time of production, the first for a delivery to meet customer demand at the time, then a quantitative way up to n times and distribution customers. Including manufacturers and customers of inventory holding costs for the construction of mathematical models to consider, and to derive the expected total inventory costs are minimized in the case, obtain the optimal lot size and shipments, exemplify the analysis , hope that this study will respond to the actual situation, providing the industry distribution of decision-making basis for reference.
|
author2 |
Yuan-shyi Peter Chiu |
author_facet |
Yuan-shyi Peter Chiu Yung-chung Chen 陳永忠 |
author |
Yung-chung Chen 陳永忠 |
spellingShingle |
Yung-chung Chen 陳永忠 Determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system with all defective items scrapped. |
author_sort |
Yung-chung Chen |
title |
Determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system with all defective items scrapped. |
title_short |
Determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system with all defective items scrapped. |
title_full |
Determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system with all defective items scrapped. |
title_fullStr |
Determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system with all defective items scrapped. |
title_full_unstemmed |
Determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system with all defective items scrapped. |
title_sort |
determining the optimal policies of (n+1) deliveries strategy for single-vendor multi-buyer integrated system with all defective items scrapped. |
publishDate |
2011 |
url |
http://ndltd.ncl.edu.tw/handle/32209098455697102746 |
work_keys_str_mv |
AT yungchungchen determiningtheoptimalpoliciesofn1deliveriesstrategyforsinglevendormultibuyerintegratedsystemwithalldefectiveitemsscrapped AT chényǒngzhōng determiningtheoptimalpoliciesofn1deliveriesstrategyforsinglevendormultibuyerintegratedsystemwithalldefectiveitemsscrapped AT yungchungchen tàntǎon1cìpèisònggěiduōgègùkèduìbùliángpǐnquánbùbàofèizhīshēngchǎnxìtǒngdeshēngchǎnpīliàngyǔpèisòngcìshùzhīzuìjiājuécè AT chényǒngzhōng tàntǎon1cìpèisònggěiduōgègùkèduìbùliángpǐnquánbùbàofèizhīshēngchǎnxìtǒngdeshēngchǎnpīliàngyǔpèisòngcìshùzhīzuìjiājuécè |
_version_ |
1718045546584735744 |