The Study of Construction Methods on Groundsill Works-Example of “Downstream Groundsill Works of Gaomei Bridge”
碩士 === 正修科技大學 === 營建工程研究所 === 99 === The rivers in Taiwan are steep and swift. Their water levels vary greatly in different seasons. In the dry season, rivers dry up and river beds are exposed; in the monsoon/typhoon season, the strong southwesterly flows bring in heavy rains, which result in dike b...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/62626013923663972338 |
id |
ndltd-TW-099CSU00582010 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-099CSU005820102015-10-13T20:32:28Z http://ndltd.ncl.edu.tw/handle/62626013923663972338 The Study of Construction Methods on Groundsill Works-Example of “Downstream Groundsill Works of Gaomei Bridge” 固床工工法之研究-以高美大橋下游固床工為例 CHUNG-YUNG CHOU 周忠勇 碩士 正修科技大學 營建工程研究所 99 The rivers in Taiwan are steep and swift. Their water levels vary greatly in different seasons. In the dry season, rivers dry up and river beds are exposed; in the monsoon/typhoon season, the strong southwesterly flows bring in heavy rains, which result in dike bursts and even bridge collapses. Such occurrences do great damage to people’s living and the economy. Bridge protection is usually achieved by utilizing apron protection, permeable piles or gabions. However, either method will decrease the cross section of a river and increase the speed of the water flow. Due to the swiftness of the rivers in Taiwan, the most ideal riverbed construction method is to create stepped cascades for the dissipation of hydraulic energy, so that the river current can be reduced in speed and erosion and sediment in amount. Nevertheless, under the extreme hydraulic conditions, the composition of the riverbeds and river topographies often cause the construction failures. In light of such situations, this study will utilize the example of the consolidation work and low-water revetment done on Gaomei bridge in 2004 to discuss the effects of different hydraulic and topographical conditions on the consolidation work, in hope that river constructions can be effectively lower the damages done by floods. 曾文哲 2011 學位論文 ; thesis 0 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 正修科技大學 === 營建工程研究所 === 99 === The rivers in Taiwan are steep and swift. Their water levels vary greatly in different seasons. In the dry season, rivers dry up and river beds are exposed; in the monsoon/typhoon season, the strong southwesterly flows bring in heavy rains, which result in dike bursts and even bridge collapses. Such occurrences do great damage to people’s living and the economy.
Bridge protection is usually achieved by utilizing apron protection, permeable piles or gabions. However, either method will decrease the cross section of a river and increase the speed of the water flow. Due to the swiftness of the rivers in Taiwan, the most ideal riverbed construction method is to create stepped cascades for the dissipation of hydraulic energy, so that the river current can be reduced in speed and erosion and sediment in amount. Nevertheless, under the extreme hydraulic conditions, the composition of the riverbeds and river topographies often cause the construction failures.
In light of such situations, this study will utilize the example of the consolidation work and low-water revetment done on Gaomei bridge in 2004 to discuss the effects of different hydraulic and topographical conditions on the consolidation work, in hope that river constructions can be effectively lower the damages done by floods.
|
author2 |
曾文哲 |
author_facet |
曾文哲 CHUNG-YUNG CHOU 周忠勇 |
author |
CHUNG-YUNG CHOU 周忠勇 |
spellingShingle |
CHUNG-YUNG CHOU 周忠勇 The Study of Construction Methods on Groundsill Works-Example of “Downstream Groundsill Works of Gaomei Bridge” |
author_sort |
CHUNG-YUNG CHOU |
title |
The Study of Construction Methods on Groundsill Works-Example of “Downstream Groundsill Works of Gaomei Bridge” |
title_short |
The Study of Construction Methods on Groundsill Works-Example of “Downstream Groundsill Works of Gaomei Bridge” |
title_full |
The Study of Construction Methods on Groundsill Works-Example of “Downstream Groundsill Works of Gaomei Bridge” |
title_fullStr |
The Study of Construction Methods on Groundsill Works-Example of “Downstream Groundsill Works of Gaomei Bridge” |
title_full_unstemmed |
The Study of Construction Methods on Groundsill Works-Example of “Downstream Groundsill Works of Gaomei Bridge” |
title_sort |
study of construction methods on groundsill works-example of “downstream groundsill works of gaomei bridge” |
publishDate |
2011 |
url |
http://ndltd.ncl.edu.tw/handle/62626013923663972338 |
work_keys_str_mv |
AT chungyungchou thestudyofconstructionmethodsongroundsillworksexampleofdownstreamgroundsillworksofgaomeibridge AT zhōuzhōngyǒng thestudyofconstructionmethodsongroundsillworksexampleofdownstreamgroundsillworksofgaomeibridge AT chungyungchou gùchuánggōnggōngfǎzhīyánjiūyǐgāoměidàqiáoxiàyóugùchuánggōngwèilì AT zhōuzhōngyǒng gùchuánggōnggōngfǎzhīyánjiūyǐgāoměidàqiáoxiàyóugùchuánggōngwèilì AT chungyungchou studyofconstructionmethodsongroundsillworksexampleofdownstreamgroundsillworksofgaomeibridge AT zhōuzhōngyǒng studyofconstructionmethodsongroundsillworksexampleofdownstreamgroundsillworksofgaomeibridge |
_version_ |
1718048048602415104 |