Safety Management in Dike Construction Project
碩士 === 長榮大學 === 職業安全與衛生學系碩士班 === 99
Main Authors: | Lin Chun Liang, 林俊良 |
---|---|
Other Authors: | 林信一 |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/40808973653786022778 |
Similar Items
-
Replan the Flows on the Construction of Dike-A Case Study of Dike Extension Project along the Wu Creek
by: Shun-Kuen Lin, et al.
Published: (2002) -
Replan the Flows on the Construction of Dike-A Case Study of Dike Extension Project along the Wu Creek
by: Shun-Kuen Lin, et al.
Published: (2002) -
The Road-dike Effect on The Inundation Damage
by: Chun-Yen Lin, et al.
Published: (2001) -
Use of displacement as a proxy for dike safety
by: E. Jamalinia, et al.
Published: (2020-04-01) -
Study on the safety of constructing the super dike near the exit of Jia-Zou-Liao river
by: YEN, HUNG-TSE, et al.
Published: (2004)