Sub-Contractor Selection Using Analytical Network Process- An Example of Architectural Formwork
碩士 === 雲林科技大學 === 營建工程系碩士班 === 98 === Considering costs and risks, contractors would not finish a construction project by its own but via sub-contractors. Currently, sub-contractor selection is based on experience and instinct. The lack of systematic selection process results in the inefficiency. Al...
Main Authors: | CHEN-HSING HUANG, 黃振興 |
---|---|
Other Authors: | none |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/26371062709877761412 |
Similar Items
-
The Feasibility Study of Utilizing Best Value Model for Contractor Selection in Building Construction-The Case Study for Formworks
by: Wei-Ning Sun, et al.
Published: (2013) -
Contractor evaluation and selection for projects using the analytic hierarchy process
by: Frielingsdorf, Klaus
Published: (2012) -
Sustainable infrastructure delivery in Nigeria: implementation of the analytic network process for contractor selection
by: Arowosafe Oluwunmi, et al.
Published: (2018-01-01) -
Using Analytic Network Process to Evaluate Collaborative Technology of Software Contractors Selection Model
by: Chia-Chun Liao, et al.
Published: (2010) -
Feasible Analytics for Optimization of Formwork in High-rise Building
by: Ming-Chung Li, et al.
Published: (2013)