Discussion about the Adjustment Mechanism of Price Fluctuation for Public Construction

碩士 === 國立臺北科技大學 === 土木與防災研究所 === 98 === These years, because of the supply-demand disequilibrium of commodities and price-hikes of petroleum and iron / steel, the price of domestic construction material is increased rapidly, which bring out contractors’ big losses. Besides, contractors are subject t...

Full description

Bibliographic Details
Main Authors: Bing-Hua Chen, 陳炳樺
Other Authors: 王隆昌
Format: Others
Language:zh-TW
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/3gzhyx
id ndltd-TW-098TIT05653049
record_format oai_dc
spelling ndltd-TW-098TIT056530492019-05-15T20:33:24Z http://ndltd.ncl.edu.tw/handle/3gzhyx Discussion about the Adjustment Mechanism of Price Fluctuation for Public Construction 公共工程物價波動價格調整機制之探討 Bing-Hua Chen 陳炳樺 碩士 國立臺北科技大學 土木與防災研究所 98 These years, because of the supply-demand disequilibrium of commodities and price-hikes of petroleum and iron / steel, the price of domestic construction material is increased rapidly, which bring out contractors’ big losses. Besides, contractors are subject to take more risks caused by the long project period. Since the fair and reasonable price-adjusting mechanism is not established, the disputes and claims for compensation happened frequently. Under the pressure of contractors’ pleading and protests, authorities are forced to amend the legulations repeatedly, which violates the consistency of government administration. Due to the wide varieties of construction types, it is improper to apply general price index to adjust contract price for all kinds of construction when encountering big price fluctuation, and the risks between public sectors and contractors can not be effectively reduced either. Nevertheless, using the individual item as the basis of calculating formula for price-adjusting is complex and isn’t accepted by authorities. It is unfavorable in establishing price-adjusting mechanism to consider the differences of construction types. Furthermore, the underestimation of price adjustment by index leads to bidding failure or lag behind schedule, even leads to contractors’ bankruptcy, which results in delay of progress in contruction project and is forced to modify construction plan. For the above reasons, this research takes international rules for reference. By discussing current problem in price adjustment by index, comparing the differences between general contract example and FIDIC formula, and employing CCI provided by DGBAS, a localized formula is constructed. Also, based on the case studies of Bridges construction project, this research proposes an easier price-adjusting formula which meets the acceptable precision in order to develop a fair and reasonable price-adjusting mechanism for authority. 王隆昌 2010 學位論文 ; thesis 125 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺北科技大學 === 土木與防災研究所 === 98 === These years, because of the supply-demand disequilibrium of commodities and price-hikes of petroleum and iron / steel, the price of domestic construction material is increased rapidly, which bring out contractors’ big losses. Besides, contractors are subject to take more risks caused by the long project period. Since the fair and reasonable price-adjusting mechanism is not established, the disputes and claims for compensation happened frequently. Under the pressure of contractors’ pleading and protests, authorities are forced to amend the legulations repeatedly, which violates the consistency of government administration. Due to the wide varieties of construction types, it is improper to apply general price index to adjust contract price for all kinds of construction when encountering big price fluctuation, and the risks between public sectors and contractors can not be effectively reduced either. Nevertheless, using the individual item as the basis of calculating formula for price-adjusting is complex and isn’t accepted by authorities. It is unfavorable in establishing price-adjusting mechanism to consider the differences of construction types. Furthermore, the underestimation of price adjustment by index leads to bidding failure or lag behind schedule, even leads to contractors’ bankruptcy, which results in delay of progress in contruction project and is forced to modify construction plan. For the above reasons, this research takes international rules for reference. By discussing current problem in price adjustment by index, comparing the differences between general contract example and FIDIC formula, and employing CCI provided by DGBAS, a localized formula is constructed. Also, based on the case studies of Bridges construction project, this research proposes an easier price-adjusting formula which meets the acceptable precision in order to develop a fair and reasonable price-adjusting mechanism for authority.
author2 王隆昌
author_facet 王隆昌
Bing-Hua Chen
陳炳樺
author Bing-Hua Chen
陳炳樺
spellingShingle Bing-Hua Chen
陳炳樺
Discussion about the Adjustment Mechanism of Price Fluctuation for Public Construction
author_sort Bing-Hua Chen
title Discussion about the Adjustment Mechanism of Price Fluctuation for Public Construction
title_short Discussion about the Adjustment Mechanism of Price Fluctuation for Public Construction
title_full Discussion about the Adjustment Mechanism of Price Fluctuation for Public Construction
title_fullStr Discussion about the Adjustment Mechanism of Price Fluctuation for Public Construction
title_full_unstemmed Discussion about the Adjustment Mechanism of Price Fluctuation for Public Construction
title_sort discussion about the adjustment mechanism of price fluctuation for public construction
publishDate 2010
url http://ndltd.ncl.edu.tw/handle/3gzhyx
work_keys_str_mv AT binghuachen discussionabouttheadjustmentmechanismofpricefluctuationforpublicconstruction
AT chénbǐnghuà discussionabouttheadjustmentmechanismofpricefluctuationforpublicconstruction
AT binghuachen gōnggònggōngchéngwùjiàbōdòngjiàgédiàozhěngjīzhìzhītàntǎo
AT chénbǐnghuà gōnggònggōngchéngwùjiàbōdòngjiàgédiàozhěngjīzhìzhītàntǎo
_version_ 1719100681181200384