Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem:A Case Study of H Company
碩士 === 南台科技大學 === 行銷與流通管理系 === 98 === In this study, the case study company is a multi-product reentrant scheduling problem production system. Power supplies for the production of products for the standardization and customized. Among the customized products increased cases of company production sch...
Main Authors: | Lee, Szu-Kuang, 李思寬 |
---|---|
Other Authors: | J.C., Huang |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/62329769643658360120 |
Similar Items
-
Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company
by: Szu-Kuang Lee, et al.
Published: (2010) -
Applying TOC to Lmprove a Push/Pull Production Scheduling Problem:A Case Study of CM Company
by: LIN YI CHIEH, et al.
Published: (100) -
The Flow-shop Scheduling Problem with Reentrant Consideration
by: Fu-chi Shih, et al.
Published: (2008) -
Production Scheduling with Muti-Type Reentrant Flow
by: Kuang-Shun Huang, et al.
Published: (2007) -
Reentrant Flow Shop Scheduling Problems in Two-Machine Systems
by: Weng, Cheng-Yi, et al.