Economic Analysis for Hybrid Renewable System at 25 Weather Stations in Taiwan
碩士 === 南台科技大學 === 電機工程系 === 98 === The aim of this thesis is to analyze the economic allocation problem for different type of hybrid renewable system. The HOMER software developed by the NationalEnergy Renewable Laboratory (NERL) is applied to simulate optimal capacity of the system. The economic is...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/04214343571367595328 |
id |
ndltd-TW-098STUT8442023 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-098STUT84420232016-11-22T04:13:28Z http://ndltd.ncl.edu.tw/handle/04214343571367595328 Economic Analysis for Hybrid Renewable System at 25 Weather Stations in Taiwan 台灣25個氣象站混合式再生能源系統之經濟分析 Le Phuong Truong 黎方長 碩士 南台科技大學 電機工程系 98 The aim of this thesis is to analyze the economic allocation problem for different type of hybrid renewable system. The HOMER software developed by the NationalEnergy Renewable Laboratory (NERL) is applied to simulate optimal capacity of the system. The economic issues of optimization process can be conducted by different index, e.g., net present cost (NPC) and payback year. The impacts of the variations due to wind turbine hub height, capacity shortage and load profile are detailed investigated by three types of hybrid renewable systems. The hourly average meteorological data for solar radiation, wind speed and temperature data from the Central Weather Bureau of Taiwan at 25 sites in the year of 2008 were used to simulate the characteristics of optimal size of renewable system. The results show that the best site with minimum NPC for the Pv/battery hybrid systems are Hengchun in terms of 0% shortage and Chiaji in terms of 5% and 10% shortage, while Gilon attains the maximum NPC in all of for testing capacity shortage . For the Wind/battery hybrid system, the minimum NPC occurs at pengchiayu site and the worst site is Ilan. The Pengchiayu is the best site and Alishan is the worst site for the Wind /battery hybrid system. The sensitivity analysis of system capacity shortage has conducted by variations of NPC and site. The ratio of capacity shortage reduction or increment has different influences to the value of NPC at different sites in Taiwan. The conclusion of influencing payback year to different capacity shortage is also studies.The comparison among different hybrid systems, PV/wind/ battery and PV/battery are more proper than the Wind/battery hybrid system in Taiwan. Keywords: Economic analysis, optimal sizing, Stand alone hybrid renewa Jeeng Min Ling 凌拯民 2010 學位論文 ; thesis 121 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 南台科技大學 === 電機工程系 === 98 === The aim of this thesis is to analyze the economic allocation problem for different type of hybrid renewable system. The HOMER software developed by the NationalEnergy Renewable Laboratory (NERL) is applied to simulate optimal capacity of the system. The economic issues of optimization process can be conducted by different
index, e.g., net present cost (NPC) and payback year. The impacts of the variations due to wind turbine hub height, capacity shortage and load profile are detailed investigated by three types of hybrid renewable systems. The hourly average meteorological data for solar radiation, wind speed and temperature data from the Central Weather Bureau of Taiwan at 25 sites in the year of 2008 were used to
simulate the characteristics of optimal size of renewable system.
The results show that the best site with minimum NPC for the Pv/battery hybrid systems are Hengchun in terms of 0% shortage and Chiaji in terms of 5% and 10% shortage, while Gilon attains the maximum NPC in all of for testing capacity shortage . For the Wind/battery hybrid system, the minimum NPC occurs at pengchiayu site and the worst site is Ilan. The Pengchiayu is the best site and
Alishan is the worst site for the Wind /battery hybrid system.
The sensitivity analysis of system capacity shortage has conducted by variations of NPC and site. The ratio of capacity shortage reduction or increment has different influences to the value of NPC at different sites in Taiwan. The conclusion of influencing payback year to different capacity shortage is also studies.The comparison among different hybrid systems, PV/wind/ battery and PV/battery are
more proper than the Wind/battery hybrid system in Taiwan.
Keywords: Economic analysis, optimal sizing, Stand alone hybrid renewa
|
author2 |
Jeeng Min Ling |
author_facet |
Jeeng Min Ling Le Phuong Truong 黎方長 |
author |
Le Phuong Truong 黎方長 |
spellingShingle |
Le Phuong Truong 黎方長 Economic Analysis for Hybrid Renewable System at 25 Weather Stations in Taiwan |
author_sort |
Le Phuong Truong |
title |
Economic Analysis for Hybrid Renewable System at 25 Weather Stations in Taiwan |
title_short |
Economic Analysis for Hybrid Renewable System at 25 Weather Stations in Taiwan |
title_full |
Economic Analysis for Hybrid Renewable System at 25 Weather Stations in Taiwan |
title_fullStr |
Economic Analysis for Hybrid Renewable System at 25 Weather Stations in Taiwan |
title_full_unstemmed |
Economic Analysis for Hybrid Renewable System at 25 Weather Stations in Taiwan |
title_sort |
economic analysis for hybrid renewable system at 25 weather stations in taiwan |
publishDate |
2010 |
url |
http://ndltd.ncl.edu.tw/handle/04214343571367595328 |
work_keys_str_mv |
AT lephuongtruong economicanalysisforhybridrenewablesystemat25weatherstationsintaiwan AT lífāngzhǎng economicanalysisforhybridrenewablesystemat25weatherstationsintaiwan AT lephuongtruong táiwān25gèqìxiàngzhànhùnhéshìzàishēngnéngyuánxìtǒngzhījīngjìfēnxī AT lífāngzhǎng táiwān25gèqìxiàngzhànhùnhéshìzàishēngnéngyuánxìtǒngzhījīngjìfēnxī |
_version_ |
1718397323259674624 |