Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company

碩士 === 南台科技大學 === 行銷與流通管理系 === 98 === In this study, the case study company is a multi-product reentrant scheduling problem production system. Power supplies for the production of products for the standardization and customized. Among the customized products increased cases of company production sch...

Full description

Bibliographic Details
Main Authors: Szu-Kuang Lee, 李思寬
Other Authors: Jimmy Chung-Cheng Huang
Format: Others
Language:zh-TW
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/03906755405866897916
id ndltd-TW-098STUT0691009
record_format oai_dc
spelling ndltd-TW-098STUT06910092016-11-22T04:13:41Z http://ndltd.ncl.edu.tw/handle/03906755405866897916 Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company 應用限制理論分析多產品迴流性流程型生產排程問題—以Η公司為例 Szu-Kuang Lee 李思寬 碩士 南台科技大學 行銷與流通管理系 98 In this study, the case study company is a multi-product reentrant scheduling problem production system. Power supplies for the production of products for the standardization and customized. Among the customized products increased cases of company production scheduling system complexity. The objectives of this research are how to find out what hidden in case the company manufacturing scheduling problems and be a valid point in time to complete the product, in order to reduce product delay delivery time. For the case’s production problem, multi-product reentrant scheduling problem production, of this study, using the Goldratt Theory of Constraints, TOC, logic, to find a case study of production scheduling problems, limit, in the real. And apply the Drum, Buffer, Rope, DBR, and scheduling method arising from the theory of constraints. To assistance in case of company focused on the scheduling restrictions in, and how to use the company's limited resources and use it to focus on the most important place of the production system. At the same time, developed an effective solution to the problem of site scheduling method, not only to reduce product delivery time delay, also helped the case company in the production of utility gain maximum benefit. Jimmy Chung-Cheng Huang 黃仲正 2010 學位論文 ; thesis 49 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 南台科技大學 === 行銷與流通管理系 === 98 === In this study, the case study company is a multi-product reentrant scheduling problem production system. Power supplies for the production of products for the standardization and customized. Among the customized products increased cases of company production scheduling system complexity. The objectives of this research are how to find out what hidden in case the company manufacturing scheduling problems and be a valid point in time to complete the product, in order to reduce product delay delivery time. For the case’s production problem, multi-product reentrant scheduling problem production, of this study, using the Goldratt Theory of Constraints, TOC, logic, to find a case study of production scheduling problems, limit, in the real. And apply the Drum, Buffer, Rope, DBR, and scheduling method arising from the theory of constraints. To assistance in case of company focused on the scheduling restrictions in, and how to use the company's limited resources and use it to focus on the most important place of the production system. At the same time, developed an effective solution to the problem of site scheduling method, not only to reduce product delivery time delay, also helped the case company in the production of utility gain maximum benefit.
author2 Jimmy Chung-Cheng Huang
author_facet Jimmy Chung-Cheng Huang
Szu-Kuang Lee
李思寬
author Szu-Kuang Lee
李思寬
spellingShingle Szu-Kuang Lee
李思寬
Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company
author_sort Szu-Kuang Lee
title Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company
title_short Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company
title_full Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company
title_fullStr Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company
title_full_unstemmed Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company
title_sort applying toc theory in a multi-product reentrant scheduling problem: a case study of h company
publishDate 2010
url http://ndltd.ncl.edu.tw/handle/03906755405866897916
work_keys_str_mv AT szukuanglee applyingtoctheoryinamultiproductreentrantschedulingproblemacasestudyofhcompany
AT lǐsīkuān applyingtoctheoryinamultiproductreentrantschedulingproblemacasestudyofhcompany
AT szukuanglee yīngyòngxiànzhìlǐlùnfēnxīduōchǎnpǐnhuíliúxìngliúchéngxíngshēngchǎnpáichéngwèntíyǐēgōngsīwèilì
AT lǐsīkuān yīngyòngxiànzhìlǐlùnfēnxīduōchǎnpǐnhuíliúxìngliúchéngxíngshēngchǎnpáichéngwèntíyǐēgōngsīwèilì
_version_ 1718397482927390720