Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company
碩士 === 南台科技大學 === 行銷與流通管理系 === 98 === In this study, the case study company is a multi-product reentrant scheduling problem production system. Power supplies for the production of products for the standardization and customized. Among the customized products increased cases of company production sch...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/03906755405866897916 |
id |
ndltd-TW-098STUT0691009 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-098STUT06910092016-11-22T04:13:41Z http://ndltd.ncl.edu.tw/handle/03906755405866897916 Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company 應用限制理論分析多產品迴流性流程型生產排程問題—以Η公司為例 Szu-Kuang Lee 李思寬 碩士 南台科技大學 行銷與流通管理系 98 In this study, the case study company is a multi-product reentrant scheduling problem production system. Power supplies for the production of products for the standardization and customized. Among the customized products increased cases of company production scheduling system complexity. The objectives of this research are how to find out what hidden in case the company manufacturing scheduling problems and be a valid point in time to complete the product, in order to reduce product delay delivery time. For the case’s production problem, multi-product reentrant scheduling problem production, of this study, using the Goldratt Theory of Constraints, TOC, logic, to find a case study of production scheduling problems, limit, in the real. And apply the Drum, Buffer, Rope, DBR, and scheduling method arising from the theory of constraints. To assistance in case of company focused on the scheduling restrictions in, and how to use the company's limited resources and use it to focus on the most important place of the production system. At the same time, developed an effective solution to the problem of site scheduling method, not only to reduce product delivery time delay, also helped the case company in the production of utility gain maximum benefit. Jimmy Chung-Cheng Huang 黃仲正 2010 學位論文 ; thesis 49 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 南台科技大學 === 行銷與流通管理系 === 98 === In this study, the case study company is a multi-product reentrant scheduling problem production system. Power supplies for the production of products for the standardization and customized. Among the customized products increased cases of company production scheduling system complexity. The objectives of this research are how to find out what hidden in case the company manufacturing scheduling problems and be a valid point in time to complete the product, in order to reduce product delay delivery time.
For the case’s production problem, multi-product reentrant scheduling problem production, of this study, using the Goldratt Theory of Constraints, TOC, logic, to find a case study of production scheduling problems, limit, in the real. And apply the Drum, Buffer, Rope, DBR, and scheduling method arising from the theory of constraints. To assistance in case of company focused on the scheduling restrictions in, and how to use the company's limited resources and use it to focus on the most important place of the production system. At the same time, developed an effective solution to the problem of site scheduling method, not only to reduce product delivery time delay, also helped the case company in the production of utility gain maximum benefit.
|
author2 |
Jimmy Chung-Cheng Huang |
author_facet |
Jimmy Chung-Cheng Huang Szu-Kuang Lee 李思寬 |
author |
Szu-Kuang Lee 李思寬 |
spellingShingle |
Szu-Kuang Lee 李思寬 Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company |
author_sort |
Szu-Kuang Lee |
title |
Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company |
title_short |
Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company |
title_full |
Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company |
title_fullStr |
Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company |
title_full_unstemmed |
Applying TOC Theory in a Multi-Product Reentrant Scheduling Problem: A Case Study of H Company |
title_sort |
applying toc theory in a multi-product reentrant scheduling problem: a case study of h company |
publishDate |
2010 |
url |
http://ndltd.ncl.edu.tw/handle/03906755405866897916 |
work_keys_str_mv |
AT szukuanglee applyingtoctheoryinamultiproductreentrantschedulingproblemacasestudyofhcompany AT lǐsīkuān applyingtoctheoryinamultiproductreentrantschedulingproblemacasestudyofhcompany AT szukuanglee yīngyòngxiànzhìlǐlùnfēnxīduōchǎnpǐnhuíliúxìngliúchéngxíngshēngchǎnpáichéngwèntíyǐēgōngsīwèilì AT lǐsīkuān yīngyòngxiànzhìlǐlùnfēnxīduōchǎnpǐnhuíliúxìngliúchéngxíngshēngchǎnpáichéngwèntíyǐēgōngsīwèilì |
_version_ |
1718397482927390720 |