Failure Mode and Effects Analysis Apply on the Construction Risk of Cured-In-Place Pipe Method
碩士 === 國立虎尾科技大學 === 工業工程與管理研究所 === 98 === Varieties of No-Dig Renewal Method applications internationally, in which Cured-In-Place Pipe Method (CIPP) is most widely use in repairing of existing pipelines for domestic and foreign. However, this construction method has threshold of technology transfer...
Main Authors: | I-Chun Chen, 陳逸群 |
---|---|
Other Authors: | 張俊郎 |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/6t39p9 |
Similar Items
-
Parameter Analysis of Wall Thickness of Cured-in-Place Pipe Linings for Semistructured Rehabilitation of Concrete Drainage Pipe
by: Hongyuan Fang, et al.
Published: (2020-01-01) -
Volatile Organic Compound (VOC) Emission during Cured-in-Place-Pipe (CIPP) Sewer Pipe Rehabilitation
by: Ajdari, Elena Bourbour
Published: (2016) -
Development of an optimum pipeline renovation using Cured-In-Place Pipe (CIPP) techniques
by: Razmara, Mohammad
Published: (2008) -
Failure Mode and Effects Analysis Apply on the Construction Risk ofShield Tunneling
by: Lo Jui-Hsueh, et al.
Published: (2007) -
Failure Modes and Construction Checklist for Cast-in-Place Cantilever Construction Prestressed Bridges
by: Ying-Chieh Ma, et al.