An Integrated Quantitative Risk Analysis Method for Major Construction Accidents Using Fuzzy Concepts and Influence Diagram
博士 === 國立臺灣科技大學 === 營建工程系 === 98 === Construction work is hazardous work because the construction site is an open, unique and complex system. The losses caused by major construction accidents may bring serious financial impacts to construction enterprises. Accident analysis (post-accident) and quant...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/99475749361870575215 |
id |
ndltd-TW-098NTUS5512012 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-098NTUS55120122016-04-22T04:23:32Z http://ndltd.ncl.edu.tw/handle/99475749361870575215 An Integrated Quantitative Risk Analysis Method for Major Construction Accidents Using Fuzzy Concepts and Influence Diagram 運用模糊理論及影響圖於營造業重大災害風險之量化評估 Chen-Chung Lin 林楨中 博士 國立臺灣科技大學 營建工程系 98 Construction work is hazardous work because the construction site is an open, unique and complex system. The losses caused by major construction accidents may bring serious financial impacts to construction enterprises. Accident analysis (post-accident) and quantitative risk analysis (pre-accident) is essential to accident risk management and safety economic evaluation. The first part of this paper is to collect major accident reports from 2000 to 2008 (1437 cases) for data coding and digitalization. By adopting information technology to develop an accident analysis information platform, this research can achieve the analysis of historical major accidents. The second part of this paper is to develop a novel risk quantification methodology. Based on expert judgment, this paper applies accident-causation theory, influence diagrams and fuzzy theory to develop a quantitative method for accident risk analysis. The present method may assist enterprises to analyze the quantitative risk of construction accidents, the influence of safety factors and the cost-benefit of safety investment decisions. As an illustrative example, the quantitative risk analysis of a major accident that may happen when construction is shown by the application of a modularized computing language. Yong-Huang Lin 林耀煌 2010 學位論文 ; thesis 137 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
博士 === 國立臺灣科技大學 === 營建工程系 === 98 === Construction work is hazardous work because the construction site is an open, unique and complex system. The losses caused by major construction accidents may bring serious financial impacts to construction enterprises. Accident analysis (post-accident) and quantitative risk analysis (pre-accident) is essential to accident risk management and safety economic evaluation. The first part of this paper is to collect major accident reports from 2000 to 2008 (1437 cases) for data coding and digitalization. By adopting information technology to develop an accident analysis information platform, this research can achieve the analysis of historical major accidents. The second part of this paper is to develop a novel risk quantification methodology. Based on expert judgment, this paper applies accident-causation theory, influence diagrams and fuzzy theory to develop a quantitative method for accident risk analysis. The present method may assist enterprises to analyze the quantitative risk of construction accidents, the influence of safety factors and the cost-benefit of safety investment decisions. As an illustrative example, the quantitative risk analysis of a major accident that may happen when construction is shown by the application of a modularized computing language.
|
author2 |
Yong-Huang Lin |
author_facet |
Yong-Huang Lin Chen-Chung Lin 林楨中 |
author |
Chen-Chung Lin 林楨中 |
spellingShingle |
Chen-Chung Lin 林楨中 An Integrated Quantitative Risk Analysis Method for Major Construction Accidents Using Fuzzy Concepts and Influence Diagram |
author_sort |
Chen-Chung Lin |
title |
An Integrated Quantitative Risk Analysis Method for Major Construction Accidents Using Fuzzy Concepts and Influence Diagram |
title_short |
An Integrated Quantitative Risk Analysis Method for Major Construction Accidents Using Fuzzy Concepts and Influence Diagram |
title_full |
An Integrated Quantitative Risk Analysis Method for Major Construction Accidents Using Fuzzy Concepts and Influence Diagram |
title_fullStr |
An Integrated Quantitative Risk Analysis Method for Major Construction Accidents Using Fuzzy Concepts and Influence Diagram |
title_full_unstemmed |
An Integrated Quantitative Risk Analysis Method for Major Construction Accidents Using Fuzzy Concepts and Influence Diagram |
title_sort |
integrated quantitative risk analysis method for major construction accidents using fuzzy concepts and influence diagram |
publishDate |
2010 |
url |
http://ndltd.ncl.edu.tw/handle/99475749361870575215 |
work_keys_str_mv |
AT chenchunglin anintegratedquantitativeriskanalysismethodformajorconstructionaccidentsusingfuzzyconceptsandinfluencediagram AT línzhēnzhōng anintegratedquantitativeriskanalysismethodformajorconstructionaccidentsusingfuzzyconceptsandinfluencediagram AT chenchunglin yùnyòngmóhúlǐlùnjíyǐngxiǎngtúyúyíngzàoyèzhòngdàzāihàifēngxiǎnzhīliànghuàpínggū AT línzhēnzhōng yùnyòngmóhúlǐlùnjíyǐngxiǎngtúyúyíngzàoyèzhòngdàzāihàifēngxiǎnzhīliànghuàpínggū AT chenchunglin integratedquantitativeriskanalysismethodformajorconstructionaccidentsusingfuzzyconceptsandinfluencediagram AT línzhēnzhōng integratedquantitativeriskanalysismethodformajorconstructionaccidentsusingfuzzyconceptsandinfluencediagram |
_version_ |
1718231493159944192 |