A System Dynamics Approach to Construction Project Managerment - Substation of Taiwan Power Company for example
碩士 === 國立中山大學 === 資訊管理學系研究所 === 98 === Timing, cost, and quality are the key elements in the construction project. (We can call it “elements triangle”) Whenever one of the elements is being changed, such as the project progress delay, the cost surpass the budget or the quality flaw excessively many...
Main Authors: | Yu-cheng Chen, 陳毓錚 |
---|---|
Other Authors: | Y.M.Tu |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/42436235967298536827 |
Similar Items
-
CHANGE MODEL ADVANTAGES ON THE CHANGE MANAGERMENT PERFORMANCE-The perspective of Taiwan listed companies-
by: Yu-Yuan Liu, et al.
Published: (2004) -
A Study of the Managerment Platform of the Collaborative Design Project
by: Yao-Chiang Dai, et al.
Published: (2002) -
Integrated Centeral Survellance Managerment System
by: Hung Wei Huang, et al. -
Integrated Mobility Managerment of Mobile IP and GPRS
by: Chun-I Chiu, et al.
Published: (2000) -
The empirical study of environmental accounting and environmental managerment acccounting
by: Lee, Doris, et al.
Published: (1997)