A study of reviewing engineering and management performance - A MRT station case study
碩士 === 國立高雄第一科技大學 === 營建工程所 === 98 === This study is based on the construction of MRT project. With keeping both project organization chart and design complexity under the same conditions, we collect two payment milestone situation of four stations and set up three Quality Performance Index: 1."...
Main Authors: | Chien-Tung Chen, 陳建同 |
---|---|
Other Authors: | Chien-Liang Lin |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/85272524292622281041 |
Similar Items
-
The Study on the Product Characteristics of MRT Station Shops
by: CHEN,CHIEN-HSU, et al.
Published: (2018) -
A study on the M.R.T. Station Plaza Planning─M.R.T. Tan-shui Station Rear Plaza as a case study
by: Chien-Huang Chou, et al.
Published: (2008) -
The Studies of Performance Engineering Designs for Station of Metro Rapid Transit ( MRT )
by: 林靜慈
Published: (2006) -
A Case Study of Public Art and Historic Site Proterction in MRT Station– Using Taipei MRT Station as an Example
by: Yeh- Huang Chang, et al.
Published: (2013) -
Studies of Sophisticated Safety and Health Management of Construction Engineering -Taking MRT Station as an Example
by: WEN-PIN KUO, et al.
Published: (2016)