An Optimal Time-Cost Trade-Off Procedure of Project Scheduling under the Fuzzy Estimation of Duration and Precedence Relationship of Activities
碩士 === 國立宜蘭大學 === 土木工程學系碩士班 === 98 === Many uncertain factors can have a substantial effect on project planning. Factors such as weather, geographical features, technical skills, resource allocation, and construction interface, often result in ambiguous estimated project durations and precedence re...
Main Authors: | Hua-Wei Chiou, 邱華偉 |
---|---|
Other Authors: | Hao-His Tseng |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/70469334044337312328 |
Similar Items
-
Discrete Time/cost Trade-off Problem In Project Scheduling
by: Hafizoglu, Ahmet Baykal
Published: (2007) -
Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach
by: Sayyid Ali Banihashemi, et al.
Published: (2021-08-01) -
Optimized Management Strategy for Construction Projects Considering the Trade-off of Estimate Schedule and Cost at Completion
by: Liem Stefani Meilia Gunawan, et al.
Published: (2019) -
Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects
by: Hongbo Li, et al.
Published: (2018-08-01) -
Time, Cost and Safety Trade-off Analysis of Project Compression
by: Wei-MinChiu, et al.
Published: (2015)