A Single Period Procurement Policy when Facing Two Suppliers with Uncertain Yield Rates
碩士 === 國立交通大學 === 工業工程與管理學系 === 98 === Because of the potential customer segment and rapid technological progress, more firms are built to serve the market. When a customer has more choices to choose, would a customer only choose one supplier or choose both suppliers? In this research, we assume t...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/23973740374686431961 |
id |
ndltd-TW-098NCTU5031087 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-098NCTU50310872016-04-18T04:21:47Z http://ndltd.ncl.edu.tw/handle/23973740374686431961 A Single Period Procurement Policy when Facing Two Suppliers with Uncertain Yield Rates 兩供應商良率不確定下單週期數量採購之研究 Chen, Pei-I 陳佩宜 碩士 國立交通大學 工業工程與管理學系 98 Because of the potential customer segment and rapid technological progress, more firms are built to serve the market. When a customer has more choices to choose, would a customer only choose one supplier or choose both suppliers? In this research, we assume the production yield rates of the suppliers are random variables, and the assembly firm needs to decide the order quantity. We consider the uncertain yield rates of the suppliers and the trade-off between shortage cost and salvage cost. We propose a single period model to determine the optimal order quantity of the assembly firm where the assembly firm minimizes its own cost. Then we find the condition that the assembly firm only orders from one supplier or two suppliers. Finally, we demonstrate our results by a numerical case and conduct the parameter analysis to observe how parameters affect the assembly firm’s decision. Hong, I-Hsuan Chen, Wen-Chih 洪一薰 陳文智 2010 學位論文 ; thesis 56 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立交通大學 === 工業工程與管理學系 === 98 === Because of the potential customer segment and rapid technological progress, more firms are built to serve the market. When a customer has more choices to choose, would a customer only choose one supplier or choose both suppliers? In this research, we assume the production yield rates of the suppliers are random variables, and the assembly firm needs to decide the order quantity. We consider the uncertain yield rates of the suppliers and the trade-off between shortage cost and salvage cost. We propose a single period model to determine the optimal order quantity of the assembly firm where the assembly firm minimizes its own cost. Then we find the condition that the assembly firm only orders from one supplier or two suppliers. Finally, we demonstrate our results by a numerical case and conduct the parameter analysis to observe how parameters affect the assembly firm’s decision.
|
author2 |
Hong, I-Hsuan |
author_facet |
Hong, I-Hsuan Chen, Pei-I 陳佩宜 |
author |
Chen, Pei-I 陳佩宜 |
spellingShingle |
Chen, Pei-I 陳佩宜 A Single Period Procurement Policy when Facing Two Suppliers with Uncertain Yield Rates |
author_sort |
Chen, Pei-I |
title |
A Single Period Procurement Policy when Facing Two Suppliers with Uncertain Yield Rates |
title_short |
A Single Period Procurement Policy when Facing Two Suppliers with Uncertain Yield Rates |
title_full |
A Single Period Procurement Policy when Facing Two Suppliers with Uncertain Yield Rates |
title_fullStr |
A Single Period Procurement Policy when Facing Two Suppliers with Uncertain Yield Rates |
title_full_unstemmed |
A Single Period Procurement Policy when Facing Two Suppliers with Uncertain Yield Rates |
title_sort |
single period procurement policy when facing two suppliers with uncertain yield rates |
publishDate |
2010 |
url |
http://ndltd.ncl.edu.tw/handle/23973740374686431961 |
work_keys_str_mv |
AT chenpeii asingleperiodprocurementpolicywhenfacingtwosupplierswithuncertainyieldrates AT chénpèiyí asingleperiodprocurementpolicywhenfacingtwosupplierswithuncertainyieldrates AT chenpeii liǎnggōngyīngshāngliánglǜbùquèdìngxiàdānzhōuqīshùliàngcǎigòuzhīyánjiū AT chénpèiyí liǎnggōngyīngshāngliánglǜbùquèdìngxiàdānzhōuqīshùliàngcǎigòuzhīyánjiū AT chenpeii singleperiodprocurementpolicywhenfacingtwosupplierswithuncertainyieldrates AT chénpèiyí singleperiodprocurementpolicywhenfacingtwosupplierswithuncertainyieldrates |
_version_ |
1718226461231415296 |