The Construction of Master Production Scheduling System and Available-to-Promise Mechanism under Process Selectable Environment for the TFT-LCD Cell Assembly Factory
碩士 === 國立交通大學 === 工業工程與管理學系 === 98 === The cell assembly factory assembles the color filter with the glass substrate produced from array factory, and filling with liquid crystal for making thin film transistor liquid crystal display (TFT-LCD). In the process selectable environment, each custom o...
Main Authors: | Wu, Yen‐Feng, 吳彥夆 |
---|---|
Other Authors: | Chung, Shu‐Hsing |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/99289380457446392097 |
Similar Items
-
The Design of Master Production Scheduling System for TFT-LCD Cell Assembly Factory
by: 莊書銘
Published: (2007) -
The Design of Rapid Master Production Scheduling System for TFT-LCD Cell Assembly Factory
by: 林毓淳
Published: (2004) -
The Design of Master Production Scheduling for TFT-LCD Cell Assembly Factory with Two Kinds of Process Plans
by: Yang Di-Chiao, et al.
Published: (2008) -
The Design of Master Production Scheduling with Two Priority Orders for TFT-LCD Array Factory
by: Chuang, I-Chieh, et al.
Published: (2009) -
The Construction of Due Date Promising Model for TFT-LCD Module Assembly
by: 張婉茹
Published: (2005)