The Construction of Master Production Scheduling System and Available-to-Promise Mechanism under Process Selectable Environment for the TFT-LCD Cell Assembly Factory
碩士 === 國立交通大學 === 工業工程與管理學系 === 98 === The cell assembly factory assembles the color filter with the glass substrate produced from array factory, and filling with liquid crystal for making thin film transistor liquid crystal display (TFT-LCD). In the process selectable environment, each custom o...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/99289380457446392097 |